Business Suspension Records in Japan
Browse Japanese administrative enforcement records classified as Business Suspension. Each record includes the company, governing law, issuing authority, penalty amount when available, and a link to the original Japanese government disclosure.
Useful for long-tail searches such as "Business Suspension Japan company", "Japanese administrative business suspension", and "Japan regulatory sanctions by action type".
829 Japanese enforcement records
Japanese version| Date | Company | Law | Action | Penalty | Authority |
|---|---|---|---|---|---|
| 23 Oct 2026 | 鹿島建設株式会社 Kashima Construction Co., Ltd. and its employees received a fine for violating the Act on Prohibition of Private Monopolization and Maintenance of Fair Trade (Act No. 54 of 1947) in connection with allegations that they substantially restrained competition in the relevant transaction field for a terminal station new construction project involving the Linear Chuo Shinkansen (Shinagawa Station–Nagoya Station) ordered by Central Japan Railway Company. The conviction was rendered on March 1, 2021, and the sentence became final on September 19, 2026. This is considered to fall under Article 28, Paragraph 1, Items 2 and 3 of the Construction Business Act, and the Kanto Regional Development Bureau ordered a business suspension. | Construction Business Act | Business Suspension | - | Kantō Regional Development Bureau |
| 23 Oct 2026 | 大成建設株式会社 On October 23, 2026, the Kanto Regional Development Bureau ordered Taisei Construction Co., Ltd. to suspend certain business operations for 120 days (from November 7, 2026 to March 6, 2027). The order is based on the Construction Business Act, Article 28, Paragraph 3 (applicable to Paragraph 1, Items 2 and 3). The underlying cause stated is that, in connection with a terminal station new construction project for the Linear Chuo Shinkansen (Shinagawa Station–Nagoya Station) ordered by Central Japan Railway Company, Taisei Construction Co., Ltd. and its employees were found to have substantially restrained competition in the relevant transaction field, and on March 1, 2021 they received a fine judgment for violation of the Act on Prohibition of Private Monopolization and Maintenance of Fair Trade (Act No. 54 of 1947), with the sentence becoming final on September 19, 2026. | Construction Business Act | Business Suspension | - | Kantō Regional Development Bureau |
| 16 Oct 2026 | 株式会社森組 Mori-gumi Co., Ltd. (株式会社森組) was ordered to suspend business by Toyama Prefecture under Article 28, Paragraph 3 of the Construction Business Act (建設業法), which corresponds to Article 28, Paragraph 1, Item 3. The order is based on violations of Article 21, Paragraph 1 of the Industrial Safety and Health Act (労働安全衛生法) and Article 361 of the Industrial Safety and Health Regulations (労働安全衛生規則). On July 2, 2026 (Reiwa 8), the Tona-mi Summary Court issued a summary fine order of JPY 200,000, and the conviction became final on July 18. In addition, the company’s site agent received a summary fine order of JPY 400,000 on July 2, 2026 for violations of the same provisions and for the offense under the first part of Article 211 of the Penal Code (刑法), and the conviction became final on July 18. The business suspension period is from October 30, 2026 to November 1, 2026, limited to certain public works as specified in the decision. | Construction Business Act | Business Suspension | - | Toyama Prefecture |
| 9 Oct 2026 | 川上建工株式会社 On 2026-10-09, Kanagawa Prefecture ordered Kawakami Kenko Co., Ltd. (川上建工株式会社) to suspend business (営業停止) for 11 days, from 2026-10-24 to 2026-11-03. The order relates to violations of the Construction Business Act (建設業法), including conducting construction business without the required construction business license and entering into subcontract agreements exceeding the scope of “minor construction work” under the Enforcement Order of the Construction Business Act (建設業法施行令). The conduct falls under Article 28(1)(6) of the Construction Business Act (as referenced by Article 28(3)). | Construction Business Act | Business Suspension | - | Kanagawa Prefecture |
| 29 Sept 2026 | 三田建設株式会社 On 2026-09-29, Fukushima Prefecture ordered Mita Construction Co., Ltd. (三田建設株式会社; corporate number 8380001013947) to suspend business operations for 7 days, from 2026-10-13 to 2026-10-19. The suspension applies to sales related to private construction works. The stated cause is that, for private construction works, the company contracted work that does not fall under “minor construction works” as provided in the proviso to Article 3(1) of the Construction Business Act, despite not having a permit for the “scaffolding and earthwork” construction business. This is stated to fall under Article 28(1)(ii) of the Construction Business Act. | Construction Business Act | Business Suspension | - | Fukushima Prefecture |
| 29 Sept 2026 | 川北電気工業株式会社 On August 25, 2025, during pre-bid on-site investigation for an air-conditioning unit expansion construction project in Ōbu City, Aichi Prefecture (where Kawakita Denki Kogyo Co., Ltd. was preparing to be a subcontractor), a worker performing current measurement work inside an electrical distribution board touched a live part for some reason, resulting in electrocution and death. The authority states that, although there was a risk of electrocution by touching the live part, the company did not take necessary measures to prevent danger, such as requiring the worker and the live part to use insulating protective equipment, etc. On April 10, 2026, the Handa Summary Court issued a summary order: a fine of JPY 300,000 for the company for violation of the Industrial Safety and Health Act, and a fine of JPY 300,000 for one company employee for violation of the Industrial Safety and Health Act and for death by occupational negligence; the respective sentences have become final. The authority considers this to fall under Article 28, Paragraph 1, Item 3 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Chūbu Regional Development Bureau |
| 25 Sept 2026 | 合同会社翔榮 Chiba Prefecture ordered a business suspension against Godō Kaisha Shōei (合同会社翔榮) for the entire business of construction operations. The order was based on alleged violations of the Construction Business Act (建設業法) Article 28(1) item 3 and Article 28(3), relating to a subcontracting arrangement involving industrial waste transportation and demolition work. Order details (Chiba Prefecture): - Suspension period: 13 October 2026 to 19 October 2026 (7 days) - Scope: all construction business operations. | Construction Business Act | Business Suspension | - | Chiba Prefecture |
| 25 Sept 2026 | フルサワ総研 On 25 September 2026, Osaka Prefecture imposed a business suspension on フルサワ総研 (representative: 古澤 光洋) under Article 28(3) of the Construction Business Act (建設業法). The business suspension period is 30 days from 9 October 2026 to 7 November 2026, covering all business related to construction. The stated cause is that, in private construction works ordered in Habikino City, the company contracted for construction work without obtaining the permission required under Article 3(1) of the Construction Business Act. | Construction Business Act | Business Suspension | - | Osaka Prefecture |
| 24 Sept 2026 | 有限会林材木店 Chiba Prefecture ordered a business suspension for “Yamabashi Zaimoku-ten Co., Ltd.” (有限会林材木店; corporate number 8040002057746). The order was based on a finding that the company’s representative director, Shiro Hayashi (林 四郎), burned approximately 18 kg of wood waste on the company’s premises in Shiroi City on or about 8:00 a.m. on October 16, 2020, despite there being no statutory exempting grounds. Based on these facts, the company and Shiro Hayashi were each fined JPY 100,000 by a summary order dated March 5, 2021 from the Sakura Summary Court (Reiwa 3 (i) No. 76) for violations of the Act on the Processing of Waste and Public Cleansing. The conduct was deemed to fall under Article 28(1) item (3) and Article 28(3) of the Construction Business Act. | Construction Business Act | Business Suspension | - | Chiba Prefecture |
| 15 Sept 2026 | 吉井建設(株) On 2026-09-15, Nara Prefecture ordered YOSHII CONSTRUCTION CO., LTD. (吉井建設(株)) to be suspended from business related to public works for 22 days, from 2026-10-13 to 2026-11-03. The order states that, in bidding and contracting procedures for construction works ordered by Nara Prefecture, the company submitted documents indicating a person who did not actually meet the requirements for a chief technical engineer under Article 26(1) of the Construction Business Act, and did not appoint a chief technical engineer pursuant to that provision for the relevant work. The authority found these matters to fall under Article 28(1)(ii) of the Construction Business Act (as referenced by Article 28(3)). | Construction Business Act | Business Suspension | - | Nara Prefecture |
| 14 Sept 2026 | 平田塗装防水株式会社 On 2026-09-14, Fukushima Prefecture ordered Hirata Tosou Bousui Co., Ltd. to be suspended from business for 22 days (from 2026-09-28 to 2026-10-19) for violations of the Construction Business Act. The order relates to private construction contracts in which the company accepted work exceeding the scope of “minor construction work” under Article 3(1) of the Act, despite having no office technical personnel and lacking the permit requirements for waterproofing work; and in the relevant contracted work, it assigned as chief technical engineer a person who did not meet the qualification requirements for waterproofing work, in violation of Article 26(1). These matters fall under Article 28(3) (Article 28(1)(2)). | Construction Business Act | Business Suspension | - | Fukushima Prefecture |
| 26 Aug 2026 | 大成産業株式会社 On 26 August 2026, Aomori Prefecture ordered Taisei Sangyo Co., Ltd. to suspend certain construction-related business activities under the Construction Business Act. The basis stated is that a person who is deemed to have been an “employee” as defined in Article 3 of the Cabinet Order for the Construction Business Act (Cabinet Order No. 273 of 1956) was confirmed to have violated the Penal Code (Act No. 45 of 1907) in connection with their duties, which falls under Article 28(1)(iii) of the Construction Business Act (as applied via Article 28(3)). | Construction Business Act | Business Suspension | - | Aomori Prefecture |
| 21 Aug 2026 | 株式会社井上電工 In Kochi Prefecture, the company Inoue Denko Co., Ltd. (法人番号2490001004817) was ordered to suspend business under the Construction Business Act. The suspension is for one year, from September 4, 2026 to September 3, 2027, covering business related to electrical construction work involving public works. According to the stated cause, Ono Kazuyuki, who was the company’s then representative director, conspired with the representative director of Shikoku Tsushin System Co., Ltd. and, at the time, the Mayor of Tosashimizu City and members of the Tosashimizu City Assembly regarding a designated competitive bidding for the “Lodging-type Multicultural Coexistence Community Facility Renovation Work (Electrical Equipment)” conducted by Tosashimizu City. They received instruction on the minimum required price and won the contract. As a result, on June 10, 2026, the Kochi District Court found them guilty for violating Article 96-6, Paragraph 1 of the Penal Code prior to amendments made by the Act on Partial Amendment of the Penal Code, etc. (Act No. 67 of 2022), as well as Article 60 of the Penal Code (Act No. 45 of 1907). The sentence was imprisonment for one year and six months, with a three-year suspension of execution, and the conviction became final on the same date. This is stated to fall under Article 28, Paragraph 1, Item 3 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Kochi Prefecture |
| 19 Aug 2026 | 株式会社ギアマックス On 2026-08-19, Osaka Prefecture imposed a business suspension on 株式会社ギアマックス (corporate number: 7120001224496) under Article 28(3) of the Construction Business Act (建設業法). The business suspension period is from 2026-09-01 to 2026-10-14 (44 days). The suspension covers all business related to construction business activities. The alleged causes relate to violations involving (i) placement of supervisory/management engineers without meeting qualification requirements and without a direct and continuous employment relationship, (ii) subcontracting the entire construction work to 株式会社一六八建設, (iii) entering into subcontract agreements without the required permission where the subcontract amount is at or above the amount specified by Cabinet Order, (iv) entering into subcontract agreements with the company operating construction business without the required permission, and (v) failure to assign a chief technical engineer at another private construction project in Osaka City. | Construction Business Act | Business Suspension | - | Osaka Prefecture |
| 18 Aug 2026 | 株式会社野村商店 On September 29, 2023, Shizuoka Prefecture issued a correction request to the owner regarding a private residential renovation construction carried out by Nomura Shoten Co., Ltd. in Ito City in 2018, stating that the relevant building was in violation of the Building Standards Act. This was recognized as falling under Article 28, Paragraph 1, Item 3 and Article 28, Paragraph 1, Item 2 of the Construction Business Act. Shizuoka Prefecture issued a business suspension order under Article 28, Paragraph 3 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Shizuoka Prefecture |
| 18 Aug 2026 | 有限会社ワッツインターナショナル On 18 August 2026, the Tokyo Metropolitan Government ordered 有限会社ワッツインターナショナル (Watts International Co., Ltd.) to suspend all construction business operations for four days, from 1 September 2026 (Tuesday) to 4 September 2026 (Friday). The order is based on alleged violations of the Construction Business Act: the company entered into construction subcontract contracts with amounts equal to or exceeding those specified in Article 1-2, Paragraph 1 of the Enforcement Order of the Construction Business Act during a period when it did not have a construction business license, in multiple private construction projects in and around Osaka City, Osaka Prefecture, in violation of Article 3, Paragraph 1 of the Construction Business Act. This is stated to fall under Article 28, Paragraph 2, Item 2 and Paragraph 3 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Tokyo Metropolitan Government |
| 18 Aug 2026 | 株式会社大鵬 On the basis of Article 28, Paragraph 3 of the Construction Business Act, Osaka Prefecture imposed a business suspension on 株式会社大鵬. The suspension period is from September 1, 2026 to September 7, 2026 (7 days). The scope of the suspension is all business related to construction. The stated cause is that, for a privately ordered construction project in Osaka City, the company entered into a subcontract agreement with 株式会社一六八建設, which operates a construction business without obtaining the permission required under Article 3, Paragraph 1 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Osaka Prefecture |
| 18 Aug 2026 | 株式会社Daiden 株式会社Daiden On August 18, 2026, Osaka Prefecture imposed a business suspension on 株式会社Daiden (corporate number: 2120001146761) under Article 28(3) of the Construction Business Act (建設業法). The business suspension period is from September 1, 2026 to September 22, 2026 (22 days). The suspension covers all business related to construction business. The stated causes include (i) violations of Article 26(1) and Article 22(1) in connection with a private construction order in Osaka City, and (ii) a subcontract agreement with 株式会社一六八建設 without obtaining the required permission under Article 3(1). | Construction Business Act | Business Suspension | - | Osaka Prefecture |
| 18 Aug 2026 | 株式会社ユーテック On 18 August 2026, Osaka Prefecture imposed a business suspension on 株式会社ユーテック. The suspension is for 7 days from 1 September 2026 to 7 September 2026, covering all business related to construction. The stated cause is that, for private construction works ordered in Osaka City, the company entered into a subcontract agreement with 株式会社平和創建, which operates construction business without obtaining the permission required under Article 3, Paragraph 1 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Osaka Prefecture |
| 18 Aug 2026 | 株式会社安治川商店 On the basis of Article 28, Paragraph 3 of the Construction Business Act (建設業法), Osaka Prefecture imposed a business suspension on Anjigawa Shoten Co., Ltd. (株式会社安治川商店) for 7 days, from September 1, 2026 to September 7, 2026. The suspension covers all business related to construction. The stated cause is that, in private construction projects in Ibaraki City, the company entered into a subcontract agreement with Ichiroku Hensetsu Co., Ltd. (株式会社一六八建設), which conducts construction business without obtaining the permission required under Article 3, Paragraph 1 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Osaka Prefecture |
| 18 Aug 2026 | 彩蓮電工 On 2026-08-18, Osaka Prefecture issued a business suspension order to 彩蓮電工 (representative: 岡本 祐太) for violating the Construction Business Act. The order is based on the company’s subcontract agreement with 株式会社DIO for a private construction order project in Osaka City, without obtaining the permission required under Article 3(1) of the Construction Business Act. | Construction Business Act | Business Suspension | - | Osaka Prefecture |
| 18 Aug 2026 | 株式会社Acala 株式会社Acala On 2026-08-18, Osaka Prefecture imposed a business suspension on 株式会社Acala. The suspension period is from 2026-09-01 to 2026-09-07 (7 days). The suspension covers all business related to construction. The stated cause is that, for private construction works in Osaka City, the company entered into subcontract agreements where the subcontract amount was at least the amount specified by Cabinet Order under Article 3(1)(ii) of the Construction Business Act, without obtaining the permission by the category set out in Article 3(1)(ii), in violation of Article 16(1) of the same Act. | Construction Business Act | Business Suspension | - | Osaka Prefecture |
| 18 Aug 2026 | 神空調有限会社 Osaka Prefecture ordered 神空調有限会社 (corporate number: 5120902017117) to be suspended from business for 15 days for violations of the Construction Business Act, including failure to assign a person responsible for technical management at the construction site and subcontracting/contracting in violation of the Act. | Construction Business Act | Business Suspension | - | Osaka Prefecture |
| 18 Aug 2026 | 株式会社トーモク On the basis of Article 28, Paragraph 3 of the Construction Business Act, Osaka Prefecture imposed a business suspension on Tomoku Co., Ltd. (法人番号9120001160005). The suspension period is from September 1, 2026 to September 7, 2026 (7 days). The scope of the suspension is all business related to construction. The stated cause is that, for a privately ordered construction project in Ibaraki City, Tomoku Co., Ltd. entered into a subcontract agreement with Ichiroku Hensetsu Co., Ltd., which operates construction business without obtaining the permission required under Article 3, Paragraph 1 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Osaka Prefecture |
| 18 Aug 2026 | 合同会社エムプランニング On 18 August 2026, the Tokyo Metropolitan Government ordered Godō Kaisha M-Planning (合同会社エムプランニング; corporate number 8010903006259) to suspend all construction business activities for three days from 1 September 2026 to 3 September 2026. The order was based on the company’s alleged violation of the Construction Business Act: in private construction works in Kokubunji City, Tokyo, it entered into a construction contract exceeding the amount specified in Article 1-2, Paragraph 1 of the Enforcement Order of the Construction Business Act without having the permission required under Article 3, Paragraph 1 of the Construction Business Act. This was stated to fall under Article 28, Paragraph 2, Item 2 and Paragraph 3 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Tokyo Metropolitan Government |
| 18 Aug 2026 | 株式会社一六八建設 On August 18, 2026, Osaka Prefecture imposed a business suspension on 株式会社一六八建設 (corporate number: 8180001157376) under Article 28, Paragraph 3 of the Construction Business Act (建設業法). The suspension period is 45 days from September 1, 2026 to October 15, 2026, and covers all business related to construction. The company is stated to have contracted, in private construction works in Osaka City and Ibaraki City, construction work with a contract amount equal to or exceeding the amount specified in Article 1-2 of the Enforcement Order of the Construction Business Act, without obtaining the permission required under Article 3, Paragraph 1 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Osaka Prefecture |
| 18 Aug 2026 | 大畑設備株式会社 On 18 August 2026, Osaka Prefecture imposed a business suspension on Ohata Equipment Co., Ltd. (大畑設備株式会社; corporate number 2120001242354) under Article 28(3) of the Construction Business Act (建設業法). The business suspension period is 25 days from 1 September 2026 to 25 September 2026, and covers all business related to construction business. The stated grounds include: (i) in private construction works in Osaka City (the “Relevant Construction”), the company violated Article 26(1) by not assigning a person in charge of technical management of construction work at the construction site, and by not primarily performing matters such as on-site technical guidance to subcontractors, consultation with the general contractor, and making decisions/responses to matters for consultation from subcontractors; instead, it had the main portion of the plumbing work it had contracted for assigned to “東進” (Toshin). (ii) The company also violated Article 22(1) by having the construction works it had contracted for wholly subcontracted to the same party. (iii) For the Relevant Construction and private construction works in Ibaraki City, the company entered into subcontract agreements with “株式会社一六八建設” (Ichirokuhakkensetsu Co., Ltd.) without obtaining the permission required under Article 3(1) of the Construction Business Act. | Construction Business Act | Business Suspension | - | Osaka Prefecture |
| 18 Aug 2026 | スマLAB株式会社 スマLAB株式会社 On August 18, 2026, Osaka Prefecture issued a business suspension order to スマLAB株式会社 (corporate number: 2140001121647) for violating the Construction Business Act. The company was ordered to suspend all business related to construction for 7 days from September 1, 2026 to September 7, 2026. The stated cause is that, in private construction works in Osaka City, the company entered into a subcontract agreement with 株式会社一六八建設, which operates construction business without obtaining the permission required under Article 3, Paragraph 1 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Osaka Prefecture |
| 18 Aug 2026 | 株式会社インテリジェント On August 18, 2026, Osaka Prefecture imposed a business suspension on 株式会社インテリジェント (corporate number: 8122001017202) for 12 days, from September 1, 2026 to September 12, 2026. The suspension is based on Article 28, Paragraph 3 of the Construction Business Act. The stated cause is that, in private construction works in Ibaraki City, the company contracted construction works with a contract amount equal to or exceeding the amount specified in Article 1-2 of the Enforcement Order of the Construction Business Act without obtaining the permission required under Article 3, Paragraph 1 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Osaka Prefecture |
| 18 Aug 2026 | 東進 On 2026-08-18, Osaka Prefecture imposed a business suspension on 東進 (representative: 東川 孔和) under the Construction Business Act (建設業法) Article 28(3). The business suspension period is from 2026-09-01 to 2026-09-15 (15 days). The scope covers all business related to construction business. The stated cause is that, for a private construction project in Osaka City (the “Project”), the company violated Article 26(1) by not assigning a person in charge of technical management of construction work at the project site, and by not primarily performing tasks such as on-site technical guidance to subcontractors, consultation with the general contractor, and making decisions/responses regarding matters for consultation from subcontractors; the company subcontracted the plumbing work, which is the main part of the Project, from 大畑設備株式会社. The stated cause also includes a violation of Article 22(2) by taking the construction work that was subcontracted to it in its entirety. | Construction Business Act | Business Suspension | - | Osaka Prefecture |
| 17 Aug 2026 | (有)アイテック Fukushima Prefecture ordered (Yuk.) AITEC (corporate number: 380002004510) to suspend all construction business operations for 3 days, from August 31, 2026 to September 2, 2026, under the Construction Business Act (建設業法). The order relates to an incident on February 17, 2025 at a new construction project for “(tentative name) cafe kotonoha” located in Namie-machi, Futaba-gun, Fukushima Prefecture, where a worker of a second-tier subcontractor engaged by AITEC fell from a work platform of a 2.21 m height wedge-tied scaffold and died because fall-prevention equipment such as handrails and midrails were not installed. As of April 2, 2026, AITEC was fined JPY 300,000 for violations of the Industrial Safety and Health Act, and the company’s representative director was fined JPY 500,000 for violations of the Industrial Safety and Health Act and for professional negligence resulting in death. This was found to fall under Article 28, Paragraph 1, Item 3 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Fukushima Prefecture |
| 5 Aug 2026 | 株式会社イーファースト (株)イーファースト (E-First Co., Ltd.) was ordered to suspend business by Nara Prefecture. The order relates to the company’s construction business involving private construction works, where it entered into subcontract agreements for construction works other than “minor construction works” (as defined in Article 1-2, Paragraph 1 of the Order for Enforcement of the Construction Business Act) with a party that conducts construction business without a construction business license under Article 3 of the Construction Business Act. This was found to fall under Article 28, Paragraph 1, Item 6 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Nara Prefecture |
| 4 Aug 2026 | 中西興業 On 2026-08-04, Osaka Prefecture imposed a business suspension on Nakani shi Kogyo (representative: Nakani shi Yoshinobu) under Article 28(3) of the Construction Business Act (建設業法). The business suspension period is 5 days from 2026-08-07 to 2026-08-11, covering all business related to construction. The stated cause is that, in private construction works ordered in Kashiwara City, the company contracted for construction works with a contract amount equal to or exceeding the amount specified in Article 1-2 of the Enforcement Order of the Construction Business Act without obtaining the permission under Article 3(1) of the Construction Business Act. | Construction Business Act | Business Suspension | - | Osaka Prefecture |
| 29 Jul 2026 | 有限会社安藤建設 有限会社安藤建設 (Ando Construction Co., Ltd.) received a supervisory administrative order (business suspension) from Kumamoto Prefecture based on Article 28, Paragraph 3 of the Construction Business Act, for submitting a false record of practical experience and assigning a chief technical engineer who did not meet the qualification requirements in violation of Article 26, Paragraph 1, in connection with the “Hanazono 6-chome Sabo Maintenance (steep slope) Work” ordered by the Ken-ō Wide-Area Headquarters. | Construction Business Act | Business Suspension | - | Kumamoto Prefecture |
| 24 Jul 2026 | 有限会社森澤商会 On July 24, 2026, Kochi Prefecture ordered Mori-sawa Shokai Co., Ltd. (有限会社森澤商会) to suspend business under the Construction Business Act. The suspension applies to business related to waterworks facility construction work involving public works, for 21 days from August 7, 2026 to August 27, 2026. | Construction Business Act | Business Suspension | - | Kochi Prefecture |
| 24 Jul 2026 | 株式会社エスアール On July 24, 2026, Osaka Prefecture imposed a business suspension order on 株式会社エスアール (corporate number 4122001029201) under Article 28, Paragraph 3 of the Construction Business Act (建設業法). The business suspension period is 12 days from August 7, 2026 to August 18, 2026, and covers all business related to construction business. | Construction Business Act | Business Suspension | - | Osaka Prefecture |
| 24 Jul 2026 | 株式会社東武土木 The Saitama Prefecture authorities suspended the construction business license of Tobu Civil Engineering Co., Ltd. on July 24, 2026, due to violations of the Construction Business Act, specifically for engaging in multiple substantial construction projects after ceasing operations on July 25, 2024, contrary to legal requirements. | Construction Business Act | Business Suspension | - | Saitama Prefecture |
| 24 Jul 2026 | 京葉ガスエナジーソリューション株式会社 The former employee of Keiyo Gas Energy Solution Co., Ltd. was convicted of obstructing public contract proceedings related to a water pipe project in Ichikawa City, Chiba Prefecture, and received a summary order of a fine of 800,000 yen on July 3, 2025. As a result, the company is subject to a business suspension order under the Construction Business Act from August 8 to October 6, 2026. | Construction Business Act | Business Suspension | - | Kantō Regional Development Bureau |
| 21 Jul 2026 | 株式会社綾野工務店 (株)綾野工務店 The director of Ayano Construction Co., Ltd. was fined for violating waste disposal laws and received a suspension order under the Construction Business Act by Okayama Prefecture. | Construction Business Act | Business Suspension | - | Okayama Prefecture |
| 17 Jul 2026 | 株式会社竹延 株式会社 竹延 The company, 株式会社 竹延, was ordered to cease operations for 10 days by the Kinki Regional Development Bureau due to contracting subcontract work outside the scope of their construction license, violating the Building Business Act Article 28, Paragraph 1, Item 6. | Construction Business Act | Business Suspension | - | Kinki Regional Development Bureau |
| 17 Jul 2026 | 株式会社大島 The company Oshima Co., Ltd. was ordered to cease operations for seven days by the Kyushu Regional Development Bureau due to violations of the Construction Business Act, including operating without proper permits and exceeding the scope of minor construction work in subcontracting within Saga Prefecture. | Construction Business Act | Business Suspension | - | Kyūshū Regional Development Bureau |
| 14 Jul 2026 | 株式会社深沢電装 The former director of Kabushiki Kaisha Fukazawa Denso was convicted of obstructing public procurement processes related to a construction project in Katagami City, Akita Prefecture, and received a summary fine on May 27, 2026. As a result, the company is subject to a one-year suspension of construction-related business activities involving public works, from July 25, 2026, to July 24, 2027, by order of Akita Prefecture. | Construction Business Act | Business Suspension | - | Akita Prefecture |
| 13 Jul 2026 | 株式会社アーバン Tokyo Metropolitan Government imposed a business suspension on Urban Corporation for violating the Building Business Act by contracting electrical work without proper permits and exceeding the contract amount limit. | Construction Business Act | Business Suspension | - | Tokyo Metropolitan Government |
| 13 Jul 2026 | 株式会社アルセットサービス Tokyo authorities suspended the business license of株式会社アルセットサービス for violating the Construction Business Act by entering into contracts exceeding the permitted amount without proper authorization. | Construction Business Act | Business Suspension | - | Tokyo Metropolitan Government |
| 13 Jul 2026 | 有限会社川口野口左官工業 The Tokyo Metropolitan Government has ordered a business suspension for KAWAGUCHI NOGUCHI SAKAN KOGYO LLC due to violations of the Construction Business Act, specifically for contracting electrical work without proper permits and exceeding the contract amount limits. | Construction Business Act | Business Suspension | - | Tokyo Metropolitan Government |
| 13 Jul 2026 | 株式会社アイテックホーム The Tokyo Metropolitan Government has suspended the operations of ITEC Home Corporation for four days from July 27 to July 30, 2026, due to violations of the Construction Business Act by entering into contracts exceeding the statutory amount without proper licensing. | Construction Business Act | Business Suspension | - | Tokyo Metropolitan Government |
| 13 Jul 2026 | 有限会社工房舎 The Tokyo Metropolitan Government has imposed a business suspension on Yugen Kaisha Kobo-sha for violating the Construction Business Act by contracting subcontractors without proper permits in multiple private projects within Hokkaido. | Construction Business Act | Business Suspension | - | Tokyo Metropolitan Government |
| 13 Jul 2026 | 日本3Dプリンター株式会社 The Tokyo Metropolitan Government issued a business suspension order to Japan 3D Printer Co., Ltd. for operating without the necessary construction license and entering into contracts exceeding the statutory amount without approval, violating the Building Business Act Articles 3 and 28. The suspension covers all construction business activities from July 27 to July 30, 2026. | Construction Business Act | Business Suspension | - | Tokyo Metropolitan Government |
| 13 Jul 2026 | 株式会社ファミリー工房 Tokyo Metropolitan Government issued a business suspension order to Family Workshop Inc. for operating without the necessary construction permits during multiple private projects in Tokyo, violating the Building Business Act. The suspension covers all construction activities from July 27 to July 30, 2026. | Construction Business Act | Business Suspension | - | Tokyo Metropolitan Government |
| 13 Jul 2026 | 株式会社大正ホーム The Tokyo Metropolitan Government has suspended the business operations of Taisho Home Co., Ltd. for three days from July 27 to July 29, 2026, due to violations of the Construction Business Act. | Construction Business Act | Business Suspension | - | Tokyo Metropolitan Government |
| 13 Jul 2026 | 橋本興業株式会社 Tokyo Metropolitan Government has ordered a business suspension for Hashimoto Kogyo Co., Ltd. due to violations of the Construction Business Act, specifically for contracting construction work exceeding the statutory amount without proper licensing. The suspension covers all construction business activities from July 27 to July 29, 2026. | Construction Business Act | Business Suspension | - | Tokyo Metropolitan Government |
| 13 Jul 2026 | 株式会社ウエダ建設 The director of Ueda Construction Co., Ltd. was convicted of violating the Waste Management and Public Cleansing Law (Law No. 137 of 1970) and sentenced to a fine of 500,000 yen by the Kashiwa Summary Court, with the sentence finalized on April 3, 2026. This violation falls under Article 28, Paragraph 1, Item 3 of the Construction Business Act. As a result, the Hyogo Prefecture has suspended the company's business operations, including prohibiting the company's officers from engaging in business during the suspension period. | Construction Business Act | Business Suspension | - | Hyogo Prefecture |
| 13 Jul 2026 | 有限会社菅澤工務店 The Tokyo Metropolitan Government has suspended the construction company, Sugasawa Komuten Co., Ltd., for violating the Building Business Act by entering into contracts exceeding the statutory amount without proper authorization for painting work, which constitutes grounds for suspension under the law. | Construction Business Act | Business Suspension | - | Tokyo Metropolitan Government |
| 13 Jul 2026 | 株式会社豊田住宅 The Tokyo Metropolitan Government has ordered a business suspension for Toyota Housing Co., Ltd. due to violations of the Construction Business Act, specifically for contracting electrical work without proper permits in private projects within Tokyo. | Construction Business Act | Business Suspension | - | Tokyo Metropolitan Government |
| 3 Jul 2026 | 有限会社服部工務店 The former representative director of Yugen Kaisha Hattori Komuten was convicted in March 2024 for obstructing fair public bidding through fraudulent means related to a construction project in Yatomi City, Aichi Prefecture. As a result, the company was ordered to suspend construction business activities for one year from July 18, 2024, to July 17, 2025, under the Construction Business Act Article 28, Paragraph 3. | Construction Business Act | Business Suspension | - | Aichi Prefecture |
| 3 Jul 2026 | 弥富建設株式会社 Yatomi Construction Co., Ltd.'s representative was fined for interfering with public bidding processes in May-June 2023, leading to a suspension of business activities from July 2026 to July 2027 under the Construction Business Act. | Construction Business Act | Business Suspension | - | Aichi Prefecture |
| 3 Jul 2026 | 大浜建設株式会社 The representative director of Ohama Construction Co., Ltd. was fined for obstructing fair public bidding procedures related to a construction project in Yatomi City, Aichi Prefecture, in March 2026, based on a summary order by the Nagoya Summary Court. As a result, the company’s construction business license was suspended for one year from July 18, 2026, to July 17, 2027, under the Construction Business Act, Article 28, Paragraph 3. | Construction Business Act | Business Suspension | - | Aichi Prefecture |
| 3 Jul 2026 | 株式会社佐藤工務店 The representative director of Sato Construction Co., Ltd. was fined for interfering with a public construction bid in May 2025 and was subject to a one-year suspension of business activities related to public construction projects by Aichi Prefecture from July 2026 to July 2027 under the Construction Business Act. | Construction Business Act | Business Suspension | - | Aichi Prefecture |
| 2 Jul 2026 | 株式会社Verde (株)Verde On July 2, 2026, the Nagano Prefecture ordered (株)Verde (corporate number 5100001031995) to be suspended from business under the Construction Business Act (建設業法) for five days, from July 16, 2026 to July 20, 2026. The suspension covers all business related to construction business. The stated cause is that (株)Verde repeatedly contracted construction work that does not fall under “minor construction work” provided for in the proviso to Article 3(1) of the Construction Business Act, despite not having obtained the construction business license required under Article 3(1). This is stated to fall under Article 28(2) item (ii) of the Construction Business Act (as referenced by Article 28(3)). | Construction Business Act | Business Suspension | - | Nagano Prefecture |
| 19 Jun 2026 | 新和電気工業株式会社 The Shizuoka Prefectural Government has ordered a 10-day suspension of business activities for Shinwa Electric Industry Co., Ltd. due to violations of the Construction Business Act, including unlicensed contracting beyond minor work limits and falsification of permit documents. | Construction Business Act | Business Suspension | - | Shizuoka Prefecture |
| 19 Jun 2026 | 株式会社FUKUSHO 株式会社FUKUSHO The company FUKUSHO was ordered to cease operations for 15 days by the Kyushu Regional Development Bureau due to violations of the Construction Business Act, specifically for assigning unqualified personnel as chief engineers in construction projects in Tokyo. | Construction Business Act | Business Suspension | - | Kyūshū Regional Development Bureau |
| 18 Jun 2026 | 株式会社東部興産 The Kyushu Regional Development Bureau has imposed a suspension of business activities on Tokubu Kousan Co., Ltd. for violating the Construction Business Act by engaging in construction work without proper permits and exceeding the scope of minor construction work allowed without a permit, in relation to landscaping projects in Fukuoka Prefecture. | Construction Business Act | Business Suspension | - | Kyūshū Regional Development Bureau |
| 16 Jun 2026 | (株)隆篤建設 Fukuoka Prefecture imposed a business suspension on Ruito Construction Co., Ltd. for violating the Construction Business Act by contracting non-minor construction work without proper licensing in Kitakyushu City. The suspension lasts from July 1 to July 3, 2026. | Construction Business Act | Business Suspension | - | Fukuoka Prefecture |
| 16 Jun 2026 | 有限会社東雲組 (有)東雲組 The Fukuoka Prefectural Government issued a business suspension order to (Yū) Shinonome-gumi for operating construction activities without proper permits and entering into subcontract agreements exceeding the scope of minor construction work, violating Article 28, Paragraph 1, Item 6 of the Construction Business Act. The suspension period is from July 1 to July 10, 2026. | Construction Business Act | Business Suspension | - | Fukuoka Prefecture |
| 16 Jun 2026 | RK KAWATA Fukuoka Prefecture imposed a business suspension on RK KAWATA for contracting construction work exceeding the scope of minor construction without proper licensing, violating the Construction Business Act. | Construction Business Act | Business Suspension | - | Fukuoka Prefecture |
| 9 Jun 2026 | 小久保鉄筋工業株式会社 The representative director of Kobukubo Rebar Construction Co., Ltd. was subject to a business suspension order by the Kanto Regional Development Bureau due to violations of labor laws, including exceeding permitted overtime hours without legal exemption, confirmed by a summary order with a fine of 300,000 yen each for the company and the director. This violation is recognized under Article 28, Paragraph 1, Item 3 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Kantō Regional Development Bureau |
| 5 Jun 2026 | アメリカンエンジニアリングコーポレーション The Okinawa General Bureau issued a business suspension order to American Engineering Corporation for installing unqualified technical personnel at construction sites over three fiscal years, in violation of the Construction Business Act, Article 28, Paragraph 1, Item 2. | Construction Business Act | Business Suspension | - | 沖縄総合事務局 |
| 27 May 2026 | アイテック株式会社 The representative directors of ITEC Corporation were fined for violations of the Waste Management Law and their license was suspended by the Ishikawa Prefectural Government from June 11 to June 17, 2026, for all construction-related activities. | Construction Business Act | Business Suspension | - | Ishikawa Prefecture |
| 22 May 2026 | 株式会社新都メンテナンス The company,株式会社新都メンテナンス, was ordered to suspend operations for three days from June 5 to June 7, 2026, due to violations related to construction safety laws following a fatal accident during sewer pipe construction in Kochi Prefecture. | Construction Business Act | Business Suspension | - | Kochi Prefecture |
| 20 May 2026 | 和工建設株式会社 The company, 和工建設株式会社, was subject to a business suspension order by Hokkaido due to violations related to false tax filings and legal violations under the Construction Business Act, following criminal convictions for tax evasion and related offenses. | Construction Business Act | Business Suspension | - | Hokkaido Prefecture |
| 20 May 2026 | 正和運輸株式会社 The company, 正和運輸株式会社, was subject to a business suspension order by Hokkaido due to violations related to false tax filings by former directors, which also constitutes a violation of the Construction Business Act Article 28, Paragraph 1, Item 3. | Construction Business Act | Business Suspension | - | Hokkaido Prefecture |
| 20 May 2026 | 株式会社乙邊工業 The former representative director of Kabushiki Kaisha Otonami Kogyo was convicted of obstructing public contract bidding related to Choshi City projects and sentenced to 2 years and 6 months in prison, with a 4-year probation, confirmed on April 8, 2026. This led to a business suspension order under the Construction Business Act by Chiba Prefecture from May 21, 2026, to May 20, 2027. | Construction Business Act | Business Suspension | - | Chiba Prefecture |
| 11 May 2026 | 光サービス The operator of Kōsābisu was prosecuted for incinerating industrial waste generated from construction work in a private incinerator, leading to a summary fine of 200,000 yen under the Waste Management and Public Cleansing Law. The operator was subject to a suspension of business activities from May 26 to June 1, 2026, by Shizuoka Prefecture. | Construction Business Act | Business Suspension | - | Shizuoka Prefecture |
| 1 May 2026 | 株式会社岡島電設工業 (株)岡島電設工業 The company, Okajima Densetsu Kogyo Co., Ltd., was ordered to suspend operations by Nara Prefecture for violating the Construction Business Act by entering into a construction contract exceeding the specified amount without holding the required permit. | Construction Business Act | Business Suspension | - | Nara Prefecture |
| 1 May 2026 | 株式会社ライフスケッチ (株)ライフスケッチ The company 'Life Sketch Co., Ltd.' was ordered to cease operations for 10 days by Nara Prefecture for conducting construction work without proper licensing. | Construction Business Act | Business Suspension | - | Nara Prefecture |
| 27 Apr 2026 | 森下住設株式会社 森下住設(株) On April 27, 2026, Nara Prefecture ordered Morishita Juzesetsu Co., Ltd. (森下住設(株); corporate number 4150001006226) to suspend business for 22 days for business related to public works. The suspension covers sales activities related to public works (as defined in the Construction Business Act and related regulations). | Construction Business Act | Business Suspension | - | Nara Prefecture |
| 27 Apr 2026 | 関東建設工業株式会社 Kanto Construction Industry Co., Ltd. was suspended from business activities for 60 days starting May 12, 2026, due to a criminal conviction related to bid rigging and misconduct in public construction bidding, which violates Article 28, Paragraph 1, Item 2 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Kantō Regional Development Bureau |
| 22 Apr 2026 | 株式会社アトビス The company, Atobis Co., Ltd., was suspended from business activities by Osaka Prefecture for violating the Construction Business Act by undertaking construction work for the 2025 Japan International Expo without proper authorization, exceeding the statutory amount. | Construction Business Act | Business Suspension | - | Osaka Prefecture |
| 22 Apr 2026 | 株式会社KAI The Osaka Prefectural Government has suspended the construction business license of KAI Corporation for 30 days from May 7 to June 5, 2026, due to violations of the Construction Business Act related to unpermitted large-scale construction work for the 2025 Japan International Exposition. | Construction Business Act | Business Suspension | - | Osaka Prefecture |
| 22 Apr 2026 | 株式会社BYS‐COMPANY 株式会社BYS-COMPANY The Osaka Prefecture authorities imposed a 30-day suspension on BYS-COMPANY for violating construction law regulations by undertaking large-scale construction work for the 2025 Japan International Expo without proper permits. | Construction Business Act | Business Suspension | - | Osaka Prefecture |
| 20 Apr 2026 | 朝野工業株式会社 The company used PC steel bars of different specifications from those in the design documents during the Kamo River riverbed improvement project ordered by Toyama Prefecture, without reporting this to Toyama Prefecture, resulting in a significant defect in the construction. Additionally, the company submitted a false inspection certificate claiming the PC steel bars were in accordance with the design documents. This constitutes a violation of Article 28, Paragraph 1, Item 2 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Toyama Prefecture |
| 16 Apr 2026 | 株式会社緑研 The former representative director of Kabushiki Kaisha Midori Ken was convicted of tax violations related to fictitious outsourcing expenses during the 2019-2020 fiscal years, resulting in a prison sentence and a fine. The Kyushu Regional Development Bureau has ordered a business suspension for all construction-related operations nationwide from May 1 to May 7, 2026, citing violations under the Construction Business Act Article 28, Paragraph 1, Item 3. | Construction Business Act | Business Suspension | - | Kyūshū Regional Development Bureau |
| 31 Mar 2026 | 株式会社伊藤組 The former CEO of Ito-gumi Co., Ltd. was convicted of bribery related to public construction bidding in Oguni Town, Kumamoto Prefecture, and was sentenced to 10 months in prison with a 3-year probation in March 2026. As a result, the company was suspended from construction business activities related to public works for one year by Kumamoto Prefecture. | Construction Business Act | Business Suspension | - | Kumamoto Prefecture |
| 30 Mar 2026 | 株式会社中央技術コンサルタンツ The company, 株式会社中央技術コンサルタンツ, has been ordered to cease operations from April 14, 2026, to June 12, 2026, under the Surveying Law, due to involvement in bid-rigging related to leaked information by a former employee. The cease order is based on legal provisions following criminal proceedings against the former employee. | 測量法 | Business Suspension | - | |
| 30 Mar 2026 | 八房建設株式会社 八房建設(株) Yamabe Motoyasu, the representative director of Hachibo Construction Co., Ltd., was found to have violated the Labor Standards Act by requiring workers at construction sites in Nara Prefecture to work overtime exceeding 40 hours per week and more than 8 hours per day excluding break time, from October 1, 2024, to March 31, 2025, despite no exemption applying to the company's operations. He was sentenced to a fine of 200,000 yen by the Katsuragi Summary Court on February 26, 2026, and the sentence was finalized. This conduct is recognized as corresponding to Item 3, Paragraph 1, Article 28 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Nara Prefecture |
| 26 Mar 2026 | 有限会社小倉電機サービス Ogura Denki Service Ltd. violated the Construction Business Act by entering into subcontract agreements with entities operating without the necessary permits, knowing the circumstances, in private construction projects within Tokyo. Additionally, the company engaged in electrical work without the required permit, exceeding the amount specified in the Enforcement Order of the Act. These actions correspond to Article 28, Paragraph 1, Item 6; Paragraph 2, Item 2; and Paragraph 3 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Tokyo Metropolitan Government |
| 26 Mar 2026 | 株式会社エーエスイー The construction company violated Article 3, Paragraph 1 of the Construction Business Act by undertaking construction work with a contract amount exceeding the amount specified in Enforcement Order of the Construction Business Act, without obtaining the necessary permit for scaffolding and earthwork construction, in multiple private-sector projects. | Construction Business Act | Business Suspension | - | Osaka Prefecture |
| 26 Mar 2026 | 株式会社SANZEN Sansen Corporation violated Article 3, Paragraph 1 of the Construction Business Act by undertaking multiple private construction projects in Tokyo exceeding the amount specified in Enforcement Order Article 1-2, Paragraph 1, during a period when it did not hold the necessary license. This constitutes a violation of Article 28, Paragraph 2, Items 2 and 3 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Tokyo Metropolitan Government |
| 24 Mar 2026 | 株式会社富士建設 Fujiken Sekou Co., Ltd. was found to have submitted construction history documents and lists of technical personnel that contained false information when applying for the management review from 2022 to 2024. Based on this, the company applied for bid participation qualification with Okinawa Prefecture, the public works procurer. This is recognized as corresponding to the provisions of Article 28, Paragraph 1, Item 2 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Okinawa Prefecture |
| 24 Mar 2026 | 光南建設株式会社 Konoan Construction Co., Ltd. was found to have submitted construction history documents and lists of technical personnel that contained false information when applying for the management review from 2022 to 2024. Based on this, the company applied for bid participation qualification with Okinawa Prefecture, the public works procurer. This is recognized as corresponding to the provisions of Article 28, Paragraph 1, Item 2 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Okinawa Prefecture |
| 24 Mar 2026 | 株式会社南山開発 Nanzan Kaihatsu Co., Ltd. was found to have submitted construction history documents and lists of technical personnel that contained false information when applying for management review from 2022 to 2024. Based on this, the company applied for bidding qualification with Okinawa Prefecture, the public works client. This is recognized as corresponding to the provisions of Article 28, Paragraph 1, Item 2 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Okinawa Prefecture |
| 18 Mar 2026 | 廣信建設興業株式会社 廣信建設興業(株) The Executive Director of Koshin Kensetsu Kogyo Co., Ltd. provided a bribe of approximately 90,000 yen to a Urakawa town official in May 2025, under the pretext of receiving guidance on the estimated price of public works. On February 4, 2026, in Sapporo Summary Court, he was sentenced to a fine of 300,000 yen for the crime of bribery under Article 198 of the Penal Code, and the sentence was finalized on the same day. This constitutes a violation of Article 28, Paragraph 1, Item 3 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Hokkaido Prefecture |
| 14 Mar 2026 | 株式会社S・H工業 (株)S・H工業 K.K. S.H. Kogyo contracted for foundation work worth 130,273,000 yen for the HACCP factory warehouse expansion project from October 2024 to March 2025 without possessing the permits for civil engineering or earthwork construction. This constitutes a violation of Article 28, Paragraph 1, Item 2 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Hokkaido Prefecture |
| 13 Mar 2026 | 信光実業株式会社 The former representative director of Shinko Jitsugyo Co., Ltd. was convicted of obstructing fair public bidding by using fraudulent means to interfere with the integrity of public contracts related to two bidding processes conducted by Omachi City, Nagano Prefecture, on August 21 and December 11 of Reiwa 6 (2024). On October 16 of Reiwa 7 (2025), the Nagano District Court sentenced him to one year in prison, with a three-year suspended sentence, for violating the Public Contract Act. This is deemed to correspond to items 2 and 3 of Article 28, Paragraph 1 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Kantō Regional Development Bureau |
| 12 Mar 2026 | 有限会社だるま商店 Officers of Daruma Shoten Ltd. were convicted of violating the Waste Management and Public Cleansing Law (Law No. 137 of 1970) and sentenced to a fine of 300,000 yen by Kakogawa Summary Court, with the sentence finalized on July 14, 2023. This constitutes a violation of Article 28, Paragraph 1, Item 3 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Hyogo Prefecture |
| 12 Mar 2026 | 株式会社ニシヨ工業 Officers of Nishiyo Kogyo Co., Ltd. were convicted of violating the Waste Management and Public Cleansing Law (Law No. 137 of 1970) and sentenced to a fine of 400,000 yen by the Himeji Summary Court. The sentence was finalized on July 13, 2024. This constitutes a violation of Article 28, Paragraph 1, Item 3 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Hyogo Prefecture |
| 11 Mar 2026 | 小林建設株式会社 An employee of Kobayashi Construction Co., Ltd. was convicted of obstructing public contract-related bidding processes under the crime of obstruction of public contract proceedings, by the Chiba District Court on January 15, 2026, receiving a sentence of one year in prison (with a three-year suspension). The sentence was finalized on January 30, 2026. This constitutes a violation of Article 28, Paragraph 1, Items 2 and 3 of the Act against Unjustifiable Premiums and Misleading Representations. | Construction Business Act | Business Suspension | - | Chiba Prefecture |
| 11 Mar 2026 | 多野産業株式会社 多野産業(株) In late June of Reiwa 6 (2024), Yuichiro Kosaka, then CEO of Tano Sangyo Co., Ltd., received secret information regarding the minimum bid price for the Hirai Elementary School Gymnasium Major Renovation Construction Project from Eio Tsukamoto, Vice Mayor of Fujioka City, by phone. Around July 3, Reiwa 6, Yuichiro Kosaka instructed Tano Sangyo Co., Ltd. to submit a bid equal to the minimum bid price and on July 4, the company was awarded the contract for the project. This involved using fraudulent means and disclosing confidential information related to the bid to unfairly influence the contract award. On October 7, Reiwa 7, the Maebashi District Court sentenced him to 1 year and 6 months in prison, with a three-year probation, and the sentence was finalized. | Construction Business Act | Business Suspension | - | Gunma Prefecture |
| 10 Mar 2026 | 株式会社双葉製作所 Futaba Manufacturing Co., Ltd. was involved in a tank accessory inspection equipment construction project in Oga City, Akita Prefecture, where on May 29, 2023, a generator's oil pan fell during lifting with a crane and collided with a worker inside the tank, resulting in death. The company failed to implement measures to prevent falling objects, such as setting up restricted entry zones, despite the risk of falling causing danger to workers. Although the oil pan was previously unfastened from the generator, it was not securely removed, and the company neglected its duty to prevent falling, leading to the oil pan dropping and causing the worker's death. On September 18, 2025, the Oga Summary Court sentenced the company to a fine of 300,000 yen and one employee to a fine of 500,000 yen for violations of the Industrial Safety and Health Act and for occupational negligence resulting in death. This case is recognized as applicable under Article 28, Paragraph 1, Item 3 of the Construction Business Act. | Construction Business Act | Business Suspension | - | Kantō Regional Development Bureau |
| 10 Mar 2026 | 株式会社北英建設 Kabushiki Kaisha Hokuei Kensetsu did not assign a chief technical officer to a private construction project in Hachioji City, Tokyo, contracted on April 30, Reiwa 6 (2024). This violates Article 26, Paragraph 1 of the Building Business Act and falls under Item 2, Paragraph 1, Article 28 of the same Act, making it subject to a business suspension order under Paragraph 3 of that article. | Construction Business Act | Business Suspension | - | Kyoto Prefecture |