Enforcement and administrative action

Business Suspension disclosure naming フルサワ総研

フルサワ総研

The published name has not been matched to a verified Corporate Number. Check the identity before attributing this record to a company.

Action type
Business Suspension
Law
Construction Business Act
Authority
Osaka Prefecture
Action date
25 September 2026

Published details

Authority: Osaka Prefecture (大阪府) Company: フルサワ総研(法人番号) Representative: 古澤 光洋 Main business office address: 311-1 Daikoku, Habikino City, Osaka Prefecture (大阪府羽曳野市大黒311番地の1) Legal basis: Construction Business Act (建設業法) Article 28(3) Disposition date: 25 September 2026 (2026年9月25日) Type of action: Business suspension (営業停止) Business suspension period: 30 days from 9 October 2026 (令和8年10月 9日) to 7 November 2026 (同年11月7日) Scope of suspension: All business related to construction (建設業に係る営業の全部) Permitted construction business types: None (なし) Stated facts (cause of disposition): The company, in private construction works ordered in Habikino City, contracted for construction work without obtaining the permission under Article 3(1) of the Construction Business Act, in violation of Article 3(1).

Machine-translated from the Japanese disclosure. The original Japanese text is available below.

Sources and saved materials

Review the source list, printable report and available saved files.

Evidence pack ¥4,980tax included · one-time purchase

View contents and purchase options

Available PDFs, images and other files vary by record. Check the included materials before purchasing; a source URL does not guarantee an original file is included.

Purchase and download pages are currently in Japanese. Materials retain the original source language.

Official source URL recorded · Saved content requires review

Source links and saved files require purchase. Already purchased?

Action details

Industry (as published)
建設業者
Business location address
大阪府羽曳野市大黒311番地の1
Representative
古澤 光洋
Permit / registration number
なし
Permitted business types
なし
Legal articles
建設業法第28条第3項
Additional published details

On 25 September 2026, Osaka Prefecture imposed a business suspension on フルサワ総研 (representative: 古澤 光洋) under Article 28(3) of the Construction Business Act (建設業法). The business suspension period is 30 days from 9 October 2026 to 7 November 2026, covering all business related to construction. The stated cause is that, in private construction works ordered in Habikino City, the company contracted for construction work without obtaining the permission required under Article 3(1) of the Construction Business Act.

Show original Japanese text

当該建設業を営む者は、羽曳野市内の民間発注の工事において、建設業法第3条第1項の規定に違反して同項の許可を受けないで建設工事を請け負った。

Sources, saved materials and verification

Source verification

Public-source and preservation status

Publishing authority
Osaka Prefecture
Official source URL
Recorded by RegBase
Entity match
Not confirmed; shown under the published name
Kiroku preservation
Saved content requires review

“Confirmed” means that RegBase matched this record to the cited public disclosure or entity under the stated checks. It does not verify the truth of the disclosure or guarantee the entity’s current status, creditworthiness, or any legal conclusion.

Open Sources and saved materials on this page to review the available pack contents.

About this action and law

This is a public Japanese regulatory disclosure. The exact legal effect depends on the cited source and regulator.

Construction business law covering licensing, contractor obligations, and public-interest rules for construction work.

Review the original Japanese source and determine relevance to your counterparty-risk workflow.

English translations are for reference. Verify important decisions against the original Japanese disclosure. View the Japanese page.