Enforcement record
Administrative Guidance disclosure naming 高松琴平電気鉄道株式会社
This page records one action from a Japanese government disclosure, including the published name, governing law, authority, action details, and official source.
Action type
Administrative Guidance
Law
Railway Business Act
Authority
Action date
30 June 2023
RegBase evidence report
Japanese public-record enforcement check
Saveable record of the published action, regulator source, source status, and review notes for internal compliance files.
- Report ID
- RB-EN-ENFORCEMENT-TETSUDO-JIGYOHO-G-202607261721
- Generated at
- 27 July 2026 at 02:21
- Record URL
- https://regbase.jp/en/enforcement/tetsudo-jigyoho-gao-song-qin-ping-dian-qi-tie-dao-20230630
1. Review Summary
| Disclosure name | 高松琴平電気鉄道株式会社 | Corporate Number | Not stated in the disclosure |
|---|---|---|---|
| Enforcement record | 1 record | Other confirmed records for this company | Outside this report's scope |
| Action date | 30 June 2023 | Authority | |
| Law | Railway Business Act | Action type | Administrative Guidance |
| Source status | Preserved public-source archive recorded | ||
This report summarizes public Japanese government disclosure data held by RegBase. It is not a credit score, sanctions conclusion, legal opinion, or adverse-media determination. Confirm important decisions against the linked official Japanese source.
2. Published Information
| Published name | 高松琴平電気鉄道株式会社 |
|---|
3. Enforcement Record
| Target name in disclosure | 高松琴平電気鉄道株式会社 |
|---|---|
| Authority | () |
| Law / action type | Railway Business Act / Administrative Guidance |
| Action / announcement date | Action: 30 June 2023 / Announcement: 14 May 2026 |
| English summary | On April 11, 2023, an incident occurred on the Kamifukuoka crossing between Hanazono Station and Rindō Station on the Nagao Line, where a train entered the crossing without the barrier gates being properly lowered, causing it to stop inside the crossing. Despite previous similar incidents on January 28, 2021; December 3, 2021; February 8, 2022; and April 14, 2022, and ongoing preventive measures, the same type of incident recurred. The authorities conducted safety audits on April 13, 14, and 26, 2023, and identified necessary improvements. The company was instructed to investigate the root causes, review inspection and maintenance procedures, and implement appropriate corrective actions, including reviewing the fuse replacement standards and inspection methods for electrical equipment. The company must report on the measures taken by July 31, 2023. |
| Original Japanese text | 令和5年4月11日に長尾線花園駅から林道駅間の上福岡踏切道において、踏切遮断機が遮断していない状態で列車が踏切内に進入し、停止した事象を発生させた。 貴社においては、令和3年1月28日、同年12月3日、令和4年2月8日及び同年4月14日にも同種事象を発生させ、再発防止対策を進めていたにもかかわらず、今般、本事象を発生させた。 このことを踏まえて、貴社に対して、令和5年4月13日、14日及び26日に保安監査を実施した。その結果、下記のとおり改善を要する事項が認められたことから、所要の措置を講ずるよう指示する。 改善措置を講ずるにあたっては、今回の事象が発生した背後要因を含め詳細に調査し、原因を究明したうえで、同種事象の再発防止に必要な改善策を策定するとともに、輸送の安全に係る業務が確実に実施できるよう留意すること。 なお、講じた措置については、令和5年7月31日までに報告されたい。 記 1.本事象の原因は、踏切制御用の電源を供給している柱上変圧器の2次側ヒューズが破断したため、踏切遮断機が遮断しなかったとの報告があった。 電気設備実施基準第67条に規定する電気設備の定期検査の実施状況等について、以下の事実を確認した。 (1)令和3年度のヒューズの検査結果記録を確認したところ、すべて「良」との記載であった。しかしながら、本事象の緊急の再発防止対策として全数交換を行った同型のヒューズを確認したところ、本事象で破断したヒューズ以外にも4個のヒューズに損傷があったこと。また、メーカー推奨のヒューズの耐用年数を大幅に超えて使用しているものが多数あったこと。 (2)ヒューズの検査の際に流用している「柱上変圧器取替時のマニュアル」について、ヒューズ自体を検査するように規定されていなかったこと。 (3)電気係員に対する教育及び訓練について、令和2年1月に同マニュアルを用いた柱上変圧器の取替訓練を実施したものの、それ以降、同訓練を実施していなかったこと。 よって、同種事象が多発しているなか、踏切障害事故を発生させる前に、確実にヒューズが破断した原因を追究するとともに、ヒューズの検査方法及び管理方法を見直すなど、適切に電気設備を維持管理すること。この際、ヒューズの交換の基準等を検討すること。 この検討結果を踏まえ、同マニュアルの内容を見直し改正するとともに、電気係員に対して電気設備の検査等が適切に行えるよう必要な教育及び訓練を実施すること。 2.電気設備の定期検査について、実施基準に従った取扱いが以下のとおり行われていない事実を確認した。 (1)改正前の運転保安設備実施基準第71条に規定する定期検査関係 ① 令和4年度の踏切保安装置の定期検査(検査周期3ヵ月)のうち一部の踏切保安装置について、検査基準日から起算した許容期間に至る前に検査を実施していたこと。 ② 令和4年度の信号装置の定期検査(検査周期3ヵ月)について、一部の信号機の検査結果が記録されていなかったこと。 ③ 令和元年度及び令和3年度の無線装置の定期検査(検査周期5年)について、検査結果が記録されていなかったこと。 (2)電気設備実施基準第67条に規定する配電線路の定期検査(検査周期3ヵ月)について、同実施基準第67条別表第10「電力設備検査方法」に規定する「避雷器の異常の有無」の検査項目が3ヶ月配電線路点検簿に記載されておらず、同項目の検査結果が記録されていなかったこと。 よって、定期検査の許容期間内での実施及び検査結果の確認について、実施基準に従った取扱いが確実に行われるよう管理方法及び体制を改善すること。 以上 【四国運輸局】 |
| Official source | https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=tetudou&EID=search&no=93 |
| Source archive | https://kiroku.today/a/6f3841eced8omsrb |
| Extraction / evidence timestamps | Extracted: 15 May 2026 at 06:28 / Evidence checked: 15 May 2026 at 06:28 / Archive captured: 17 May 2026 at 03:33 |
4. Business Location and Permit Details
| Business location address | 香川県高松市 |
|---|---|
| Legal articles | 鉄道に関する技術上の基準を定める省令 |
| Overview page | https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=tetudou&EID=search&no=93 |
5. Other Confirmed Records for This Company
This report covers the single government disclosure shown on this page.
Reviewer Notes
| Reviewer | Team / company | ||
|---|---|---|---|
| Review purpose | |||
| Additional notes | |||
- □ Official source URL or archived source was checked.
- □ Corporate Number, address, or other identifiers were reviewed to avoid confusing similarly named entities.
- □ This document is understood as a public-record evidence file, not a credit decision or legal opinion.
Current page: Enforcement record
This screen focuses on one disclosed action: the published name, governing law, authority, facts, source status, and review evidence.
Free report
Save the disclosure record naming 高松琴平電気鉄道株式会社
Includes the published name, regulator, governing law, source links, archive status, and reviewer note fields for internal due-diligence files.
Preserved evidence by Kiroku
Review the preserved source for 高松琴平電気鉄道株式会社
Open the preserved public source with its capture time, original artifact, available verification data, and downloadable evidence pack.
For developers: JSON integration details
You do not need this for normal browsing. Use it only when integrating this enforcement record into an internal tool or AI workflow.
Action summary
- Company
- 高松琴平電気鉄道株式会社Japanese onlyOriginal: 高松琴平電気鉄道株式会社
- Governing law
- Railway Business Act鉄道事業法
- Action type
- Administrative Guidance行政指導
- Action date
- 30 June 2023
- Issuing authority
- Industry context
- 鉄道事業者
Violation
On April 11, 2023, an incident occurred on the Kamifukuoka crossing between Hanazono Station and Rindō Station on the Nagao Line, where a train entered the crossing without the barrier gates being properly lowered, causing it to stop inside the crossing. Despite previous similar incidents on January 28, 2021; December 3, 2021; February 8, 2022; and April 14, 2022, and ongoing preventive measures, the same type of incident recurred. The authorities conducted safety audits on April 13, 14, and 26, 2023, and identified necessary improvements. The company was instructed to investigate the root causes, review inspection and maintenance procedures, and implement appropriate corrective actions, including reviewing the fuse replacement standards and inspection methods for electrical equipment. The company must report on the measures taken by July 31, 2023.
Show original Japanese text
令和5年4月11日に長尾線花園駅から林道駅間の上福岡踏切道において、踏切遮断機が遮断していない状態で列車が踏切内に進入し、停止した事象を発生させた。 貴社においては、令和3年1月28日、同年12月3日、令和4年2月8日及び同年4月14日にも同種事象を発生させ、再発防止対策を進めていたにもかかわらず、今般、本事象を発生させた。 このことを踏まえて、貴社に対して、令和5年4月13日、14日及び26日に保安監査を実施した。その結果、下記のとおり改善を要する事項が認められたことから、所要の措置を講ずるよう指示する。 改善措置を講ずるにあたっては、今回の事象が発生した背後要因を含め詳細に調査し、原因を究明したうえで、同種事象の再発防止に必要な改善策を策定するとともに、輸送の安全に係る業務が確実に実施できるよう留意すること。 なお、講じた措置については、令和5年7月31日までに報告されたい。 記 1.本事象の原因は、踏切制御用の電源を供給している柱上変圧器の2次側ヒューズが破断したため、踏切遮断機が遮断しなかったとの報告があった。 電気設備実施基準第67条に規定する電気設備の定期検査の実施状況等について、以下の事実を確認した。 (1)令和3年度のヒューズの検査結果記録を確認したところ、すべて「良」との記載であった。しかしながら、本事象の緊急の再発防止対策として全数交換を行った同型のヒューズを確認したところ、本事象で破断したヒューズ以外にも4個のヒューズに損傷があったこと。また、メーカー推奨のヒューズの耐用年数を大幅に超えて使用しているものが多数あったこと。 (2)ヒューズの検査の際に流用している「柱上変圧器取替時のマニュアル」について、ヒューズ自体を検査するように規定されていなかったこと。 (3)電気係員に対する教育及び訓練について、令和2年1月に同マニュアルを用いた柱上変圧器の取替訓練を実施したものの、それ以降、同訓練を実施していなかったこと。 よって、同種事象が多発しているなか、踏切障害事故を発生させる前に、確実にヒューズが破断した原因を追究するとともに、ヒューズの検査方法及び管理方法を見直すなど、適切に電気設備を維持管理すること。この際、ヒューズの交換の基準等を検討すること。 この検討結果を踏まえ、同マニュアルの内容を見直し改正するとともに、電気係員に対して電気設備の検査等が適切に行えるよう必要な教育及び訓練を実施すること。 2.電気設備の定期検査について、実施基準に従った取扱いが以下のとおり行われていない事実を確認した。 (1)改正前の運転保安設備実施基準第71条に規定する定期検査関係 ① 令和4年度の踏切保安装置の定期検査(検査周期3ヵ月)のうち一部の踏切保安装置について、検査基準日から起算した許容期間に至る前に検査を実施していたこと。 ② 令和4年度の信号装置の定期検査(検査周期3ヵ月)について、一部の信号機の検査結果が記録されていなかったこと。 ③ 令和元年度及び令和3年度の無線装置の定期検査(検査周期5年)について、検査結果が記録されていなかったこと。 (2)電気設備実施基準第67条に規定する配電線路の定期検査(検査周期3ヵ月)について、同実施基準第67条別表第10「電力設備検査方法」に規定する「避雷器の異常の有無」の検査項目が3ヶ月配電線路点検簿に記載されておらず、同項目の検査結果が記録されていなかったこと。 よって、定期検査の許容期間内での実施及び検査結果の確認について、実施基準に従った取扱いが確実に行われるよう管理方法及び体制を改善すること。 以上 【四国運輸局】
Business location and permit details
- Business location address
- 香川県高松市
- Legal articles
- 鉄道に関する技術上の基準を定める省令
- Overview page
- https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=tetudou&EID=search&no=93
These fields are extracted from the original Japanese disclosure or linked overview pages when available.
Compliance context
Low-mediumAdministrative guidance or supervision was publicly disclosed by the authority.
Japanese regulatory disclosure under Railway Business Act.
Use as a monitoring signal. Confirm details before treating it as a formal sanction.
This context is an operational aid for review workflows, not a credit opinion or legal conclusion.
Evidence pack
- Extracted at
- 2026-05-14T21:28:32.784+00:00
- Evidence checked
- 2026-05-14T21:28:32.784+00:00
- Archive captured
- 2026-05-16T18:33:35.670869+00:00
Show audit JSON
{
"record": {
"id": "a7e7cf75-c927-44ed-a851-795ff3efd488",
"url": "https://regbase.jp/en/enforcement/tetsudo-jigyoho-gao-song-qin-ping-dian-qi-tie-dao-20230630",
"company_name_original": "高松琴平電気鉄道株式会社",
"company_name_registry": null,
"corporate_number": null,
"law": {
"ja": "鉄道事業法",
"en": "Railway Business Act"
},
"action_type": {
"ja": "行政指導",
"en": "Administrative Guidance"
},
"authority": {
"ja": "",
"en": ""
}
},
"entity_match": {
"status": "unresolved",
"confidence": 95,
"method": "normalized_name_with_corporate_number",
"method_label": "Normalized Japanese name matched to a company profile with Corporate Number",
"notes": "Matched by normalized Japanese company name to an enriched company profile with a Corporate Number."
},
"review": {
"status": "machine_reviewed",
"label": "Machine checked"
},
"compliance_context": {
"severity": "Low-medium",
"actionMeaning": "Administrative guidance or supervision was publicly disclosed by the authority.",
"practicalNote": "Use as a monitoring signal. Confirm details before treating it as a formal sanction.",
"lawContext": "Japanese regulatory disclosure under Railway Business Act."
},
"evidence": {
"recordUrl": "https://regbase.jp/en/enforcement/tetsudo-jigyoho-gao-song-qin-ping-dian-qi-tie-dao-20230630",
"officialSourceUrl": "https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=tetudou&EID=search&no=93",
"officialDocumentUrl": null,
"archiveUrl": "https://kiroku.today/a/6f3841eced8omsrb",
"archivedSourceUrl": "https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=tetudou&EID=search&no=93",
"archiveCapturedAt": "2026-05-16T18:33:35.670869+00:00",
"extractedAt": "2026-05-14T21:28:32.784+00:00",
"translatedAt": "2026-07-06T06:52:33.673+00:00",
"evidenceCheckedAt": "2026-05-14T21:28:32.784+00:00",
"generatedAt": "2026-07-26T17:21:51.002Z"
},
"limitations": [
"RegBase aggregates public Japanese government disclosures and does not provide a credit opinion.",
"English summaries are provided for reference. The original Japanese source is authoritative.",
"Possible or unresolved entity matches should be manually verified before use in a decision."
]
}The original Japanese disclosure is the authoritative record. Use possible or unresolved matches only as leads for manual review.
Language
日本語版を見る (Japanese)Recent records in the same industry
- Administrative Guidance11 May 2026
諏訪市
Railway Business Act
- Administrative Guidance11 May 2026
福井鉄道株式会社
Railway Business Act
- Administrative Guidance28 Apr 2026
豊橋鉄道株式会社
Railway Business Act
- Administrative Guidance28 Apr 2026
小湊鉄道株式会社
Railway Business Act
- Administrative Guidance14 Apr 2026
沖縄都市モノレール株式会社
Railway Business Act
About this recordAggregated and translated from public Japanese government disclosures. The English text is for reference only — authoritative content is the linked Japanese source.