Between May 9 and May 12, 2023, the Chubu Transportation Bureau conducted a safety audit of Oigawa Railway Co., Ltd. (corporate number 1080001013422), headquartered in Shimada City, Shizuoka Prefecture. The audit revealed that the company had not performed scheduled inspections of the station buildings on the Oigawa Main Line and Ikawa Line, as required by Article 41 of the Civil Engineering Standards (Implementation Standards for Railway Facilities). Additionally, inspections of station building structures as per Article 6 of the Building Inspection Standards were not conducted. Furthermore, at Kado Station, the company was aware that the building clearance was obstructed as per Article 19 of the Civil Engineering Standards but had not taken necessary measures. The bureau instructed the company to promptly carry out the required inspections, revise relevant regulations to ensure regular inspections are properly implemented, and establish a system for training staff and monitoring inspection compliance. The company was also directed to take immediate action to remove obstructions at Kado Station and to ensure proper maintenance and management of railway facilities in accordance with applicable standards and laws. The company was required to report on the measures taken by August 3, 2023.

Machine-translated from the Japanese disclosure. The original Japanese text is available below.

Sources and saved materials

Review the source list, printable report and available saved files.

Evidence pack ¥4,980tax included · one-time purchase

View contents and purchase options

Available PDFs, images and other files vary by record. Check the included materials before purchasing; a source URL does not guarantee an original file is included.

Purchase and download pages are currently in Japanese. Materials retain the original source language.

Official source URL recorded · Saved content requires review

Source links and saved files require purchase. Already purchased?

Action details

Industry (as published)
鉄道事業者
Business location address
静岡県島田市
Legal articles
鉄道に関する技術上の基準を定める省令
Additional published details

The Chubu Transportation Bureau issued administrative guidance to Oigawa Railway Co., Ltd. following a safety audit conducted from May 9 to May 12, 2023. The audit identified deficiencies in scheduled inspections of station structures and track limits at Kado Station, and recommended immediate corrective actions, including reviewing inspection procedures and training staff. The company was instructed to report the measures taken by August 3, 2023.

Show original Japanese text

令和5年5月9日から5月12日まで、貴社に対して保安監査を実施したところであるが、監査の結果、改善を要する事項が認められたことから、下記の事項について、改善措置を講ずるよう指示する。 改善措置を講ずるにあたっては、発生した背後要因を含めて原因を究明したうえで、再発防止のための措置を講ずること。 なお、講じた措置については、令和5年8月3日までに報告されたい。 記 1.大井川本線及び井川線の乗降場の上家、井川線の継目板、道床、乗降場、伏せび及び排水こうについて、実施基準(土木編)第41条に規定する定期検査を実施していないこと、また、建造物検査基準第6条に乗降場の上家の検査項目が規定されていないことを確認した。 よって、速やかに必要な検査を実施するとともに、同実施基準第41条に基づき定期検査が確実に実施されるよう関係規定を見直すこと。また、管理者及び施設係員に対して施設の検査に関する教育及び訓練を実施し、検査の実施状況を把握する体制を構築すること。 2.門出駅の乗降場について、実施基準(土木編)第19条に規定する建築限界を支障していることを把握しているにもかかわらず、必要な措置を講じていないことを確認した。 よって、同実施基準第19条及び建造物整備心得第11条に基づき必要な措置を速やかに講ずること。また、今後の鉄道施設の管理にあたっては、実施基準等に基づく保守管理が適確に実施されるよう法令等の遵守を含め関係者に徹底するとともに、適切に施設を維持管理できる体制を構築すること。 以上 【中部運輸局】

Sources, saved materials and verification

Source verification

Public-source and preservation status

Publishing authority
Not recorded
Official source URL
Recorded by RegBase
Entity match
Not confirmed; shown under the published name
Kiroku preservation
Saved content requires review

“Confirmed” means that RegBase matched this record to the cited public disclosure or entity under the stated checks. It does not verify the truth of the disclosure or guarantee the entity’s current status, creditworthiness, or any legal conclusion.

Open Sources and saved materials on this page to review the available pack contents.

About this action and law

Administrative guidance or supervision was publicly disclosed by the authority.

Japanese regulatory disclosure under Railway Business Act.

Use as a monitoring signal. Confirm details before treating it as a formal sanction.

English translations are for reference. Verify important decisions against the original Japanese disclosure. View the Japanese page.