Enforcement and administrative action
Administrative Guidance against Minamiechizen cho
- Action type
- Administrative Guidance
- Law
- Railway Business Act
- Authority
- Not recorded
- Action date
- 30 March 2026
Published details
On February 17, 2026, a safety audit was conducted on Minami-Echizen Town by the Chubu Transport Bureau. The audit found that the changes to the Imazu No. 1 and No. 3 pair lifts' ropeway facilities were made without the necessary procedures under Article 12 of the Railway Business Act, which is applied by Article 38 of the same law. The town is instructed to promptly carry out the required procedures and implement appropriate measures to prevent recurrence. The corrective actions and root cause analysis should be reported by April 30, 2026.
Machine-translated from the Japanese disclosure. The original Japanese text is available below.
Sources and saved materials
Review the source list, printable report and available saved files.
Evidence pack ¥4,980tax included · one-time purchase
Available PDFs, images and other files vary by record. Check the included materials before purchasing; a source URL does not guarantee an original file is included.
Purchase and download pages are currently in Japanese. Materials retain the original source language.
Official source URL recorded · Saved content requires review
Source links and saved files require purchase. Already purchased?
Action details
- Industry (as published)
- 鉄道事業者
- Business location address
- 福井県南条郡南越前町
- Legal articles
- 鉄道事業法
Additional published details
On February 17, 2026, the Chubu Transport Bureau conducted a safety audit of Minami-Echizen Town. The audit identified issues related to the modification of ropeway facilities without proper procedures under the Railway Business Act. The town is instructed to implement corrective measures, investigate root causes, and report by April 30, 2026.
Show original Japanese text
令和8年2月17日(火)に、貴町に対して保安監査を実施したところであるが、監査の結果、改善を要する事項が認められたことから、下記の事項について、改善措置を講ずるよう指示する。 改善措置を講ずるにあたっては、発生した背後要因を含めて原因を究明したうえで、再発防止のための措置を講ずること。 なお、講じた措置については、令和8年4月30日までに報告されたい。 記 1.索道施設の保安設備について、鉄道事業法第38条において準用する同法第12条に基づく手続きを行っていないにもかかわらず、今庄第1ペアリフト及び今庄第3ペアリフトの索道施設が変更されていることを確認した。 よって、速やかに必要な手続きを行うとともに、同種事案が再び発生することがないよう適切な措置を講ずること。 以上 【中部運輸局】
Company information
- English name
- Minamiechizen cho Verified official source
- Japanese name
- 南越前町
- Corporate Number
- 8000020184047
- Registered address
- 福井県南条郡南越前町東大道29-1
Sources, saved materials and verification
Source verification
Public-source and preservation status
- Publishing authority
- Not recorded
- Official source URL
- Recorded by RegBase
- Entity match
- Confirmed against the current entity-resolution policy
- Kiroku preservation
- Saved content requires review
“Confirmed” means that RegBase matched this record to the cited public disclosure or entity under the stated checks. It does not verify the truth of the disclosure or guarantee the entity’s current status, creditworthiness, or any legal conclusion.
Open Sources and saved materials on this page to review the available pack contents.
About this action and law
Administrative guidance or supervision was publicly disclosed by the authority.
Japanese regulatory disclosure under Railway Business Act.
Use as a monitoring signal. Confirm details before treating it as a formal sanction.
Recent records in the same industry
- Administrative Guidance15 Sept 2026
Naka Fura No Kankou Kyoukai General Incorporated Association
Railway Business Act
- Administrative Guidance1 Sept 2026
Shizuokatetsudou Co., Ltd.
Railway Business Act
- Administrative Guidance31 Aug 2026
Ryuutetsu Co., Ltd.
Railway Business Act
- Administrative Guidance28 Aug 2026
Matsuyama City
Railway Business Act
- Administrative Guidance20 Aug 2026
TOBU RAILWAY CO.,LTD.
Railway Business Act
English translations are for reference. Verify important decisions against the original Japanese disclosure. View the Japanese page.