Company profile

Company profileConfirmed enforcement recordsEnglish summaries 1/1Japanese original

株式会社葵組

株式会社葵組· Corporate Number: 4120101000008

株式会社葵組 is a Japanese company registered in Osaka Prefecture with Corporate Number 4120101000008. RegBase lists 1 public-source enforcement record for this company. The latest listed record is classified as Directive by Osaka Prefecture under the Construction Business Act on 26 Feb 2025. Users should verify material records against the original Japanese source before making legal, credit, procurement, or onboarding decisions.

Ask RegBase about this company

Current page: Company profile

This page brings together Official Gazette notices, enforcement records, registry data, related-company signals, and source-review links for one company. Open individual enforcement records from the history section below.

Public Record Summary

Enforcement records
1
Latest public record
26 Feb 2025

Compared with 12 peer companies with enforcement records in the 建設業 industry

This company: 1/peer average: 1.5 (median 1)→ below peer average

Company Identity and Registry Data

English display name
株式会社葵組
Original Japanese name
株式会社葵組
Corporate Number
4120101000008
Representative
三井 一平
Registered address
大阪府堺市東区白鷺町1丁22番1号
Industry
建設業

Direct inquiry

Need a person to review 株式会社葵組?

No account needed

Ask a Japan-based team member to confirm the legal entity, explain the recorded public sources, or scope a documented screening.

Inquiry context: 株式会社葵組 / Corporate Number 4120101000008

No phone number or account is required. We normally reply within two to three business days. Read our privacy policy.

English public-record screening

Need a documented check for 株式会社葵組?

Get a structured English summary of the company identity and public records collected by RegBase, with source links, confirmation dates, and a clearly stated scope.

  • ✓ English and Japanese company identity
  • ✓ Enforcement and public-record summary
  • ✓ Official-source URLs and confirmation dates
  • ✓ PDF or CSV for an internal review file

This is not a credit report, safety guarantee, sanctions conclusion, legal opinion, or full due-diligence investigation.

No account required. The report opens immediately after Stripe confirms payment.

See sample screeningView pricingAsk a Japan-based researcher

Public documents and saved materials

View the original publications, see what was preserved, or download each file below.

Loading materials…

Need help interpreting these materials or confirming which legal entity they belong to? Ask RegBase about this company.

Enforcement and administrative action history

Construction Business ActDirective
Confirmed entity match

1. Contract Situation: The construction contractor was subcontracted by Hirose Corporation as a primary subcontractor for office building earthwork, shoring, formwork, and support work in Osaka City. The contractor then undertook SMW method work and support pile installation. 2. Site Conditions: The site was on a slope with approximately two inclines, covered with steel plates. A large pile driver (No. 6, weight 28 tons per square meter) was positioned on these plates. The contractor requested Hirose Corporation to level the slope, but it was not leveled. On November 1, 2024, the contractor performed ground improvement using a pile driver. On November 2, 2024, around 2:00 PM, approximately 40 mm of rain fell within one hour. Ground improvement involved mixing cement, clay minerals, and water into backfill soil as instructed by Hirose Corporation; no replacement with high-quality soil was performed. 3. Incident Details: On November 5, 2024, at around 9:35 AM, the contractor, believing the ground had hardened after more than a day since the rain, proceeded to move the pile driver without checking ground strength. Immediately after moving the equipment over the ground improved on November 1, residual soil (a mixture of cement, clay minerals, and water) used for backfill, which had absorbed moisture, caused the ground to collapse due to insufficient bearing capacity (~8 t/㎡). The collapse caused the pile driver to overturn forward, blocking a city road, damaging a museum roof across the street, entangling power lines, knocking over a utility pole, and causing a power outage affecting approximately 20 households for three hours. Pedestrians were also injured. 4. As a result, the contractor failed to properly assess and confirm ground conditions before relocating heavy machinery after weather events or construction activities, neglecting necessary safety precautions. This negligence led to the overturning of the pile driver and subsequent public hazards on November 5, 2024.

26 Feb 2025Osaka Prefecture
Official source URL recordedKiroku archive not completedReview details and sources on RegBase

Breakdown by law

Breakdown by action type

About this English name

No official English name source is recorded. The original Japanese name is shown.

If this profile contains an error or your company needs to add context, please use the data correction request form. Submissions are reviewed under RegBase editorial policy.

This page mechanically aggregates and structures public government disclosures and public registry data under the methodology. It is not legal advice, credit scoring, or a final procurement decision. Always verify against the official source pages.