Enforcement record
Directive against 株式会社葵組
This page is one enforcement record linked to a confirmed legal entity. Company-level Official Gazette notices, registry data, related-company signals, and other public records are collected on the company profile.
View company profileAction type
Directive
Law
Construction Business Act
Authority
Osaka Prefecture
Action date
26 February 2025
RegBase evidence report
Japanese public-record enforcement check
Saveable record of the confirmed target entity, regulator disclosure, source status, and review notes for internal compliance files.
- Report ID
- RB-EN-ENFORCEMENT-KENSETSU-GYOHO-KU-202607241403
- Generated at
- 24 July 2026 at 23:03
- Record URL
- https://regbase.jp/en/enforcement/kensetsu-gyoho-kui-zu-20250226
1. Review Summary
| Target entity | 株式会社葵組 | Corporate Number | 4120101000008 |
|---|---|---|---|
| Enforcement record | 1 record | Other confirmed records for this company | 0 records |
| Action date | 26 February 2025 | Authority | Osaka Prefecture |
| Law | Construction Business Act | Action type | Directive |
| Source status | Official source recorded; preserved archive is being prepared | ||
This report summarizes public Japanese government disclosure data held by RegBase. It is not a credit score, sanctions conclusion, legal opinion, or adverse-media determination. Confirm important decisions against the linked official Japanese source.
2. Target Entity
| English display name | 株式会社葵組 |
|---|---|
| Original Japanese name | 株式会社葵組 |
| English-name source | Japanese original |
| Corporate Number | 4120101000008 |
| Company status | Active |
| Representative | 三井 一平 |
| Registered address | 大阪府堺市東区白鷺町1丁22番1号 |
| Industry / capital | Industry: 建設業 / Capital: - |
3. Enforcement Record
| Target name in disclosure | 株式会社葵組 |
|---|---|
| Authority | Osaka Prefecture (大阪府) |
| Law / action type | Construction Business Act / Directive |
| Action / announcement date | Action: 26 February 2025 / Announcement: 25 April 2026 |
| English summary | 1. Contract Situation: The construction contractor was subcontracted by Hirose Corporation as a primary subcontractor for office building earthwork, shoring, formwork, and support work in Osaka City. The contractor then undertook SMW method work and support pile installation. 2. Site Conditions: The site was on a slope with approximately two inclines, covered with steel plates. A large pile driver (No. 6, weight 28 tons per square meter) was positioned on these plates. The contractor requested Hirose Corporation to level the slope, but it was not leveled. On November 1, 2024, the contractor performed ground improvement using a pile driver. On November 2, 2024, around 2:00 PM, approximately 40 mm of rain fell within one hour. Ground improvement involved mixing cement, clay minerals, and water into backfill soil as instructed by Hirose Corporation; no replacement with high-quality soil was performed. 3. Incident Details: On November 5, 2024, at around 9:35 AM, the contractor, believing the ground had hardened after more than a day since the rain, proceeded to move the pile driver without checking ground strength. Immediately after moving the equipment over the ground improved on November 1, residual soil (a mixture of cement, clay minerals, and water) used for backfill, which had absorbed moisture, caused the ground to collapse due to insufficient bearing capacity (~8 t/㎡). The collapse caused the pile driver to overturn forward, blocking a city road, damaging a museum roof across the street, entangling power lines, knocking over a utility pole, and causing a power outage affecting approximately 20 households for three hours. Pedestrians were also injured. 4. As a result, the contractor failed to properly assess and confirm ground conditions before relocating heavy machinery after weather events or construction activities, neglecting necessary safety precautions. This negligence led to the overturning of the pile driver and subsequent public hazards on November 5, 2024. |
| Original Japanese text | 1 請負契約の状況 当該建設業者は、大阪市内の民間発注の工事において、株式会社大林組から一次下請負人としてヒロセ株式会社が事務所棟無芯ソイル工事、山留・構台・支保工工事等を請け負い、同社から当該建設業者がSMW工法工事、支持杭打設工事等を請け負った。 2 工事現場の状況 当該工事現場は、約2度の傾斜がある登坂に盛られた地面上に敷鉄板が置かれ、その上に当該建設業者の大型杭打機(6号機)(重量 28t/㎡)が配置されていた。当該建設業者は、注文者であるヒロセ株式会社にはこの勾配を水平にするよう依頼していたが、水平には改善されなかった。当該建設業者は、令和6年11月1日(金)に、当該杭打機で、地盤改良材を打設する工事を施工した。令和6年11月2日(土)、当該工事現場に、14時頃の1時間に約40mmの降雨があった。 なお、表層部の地盤改良は、ヒロセ株式会社等からの指示により、埋め戻し土に地盤改良材(セメント、粘土鉱物及び水)を配合する施工方法を採用しており、良質土等による置換は行われていなかった。 3 事故の状況 当該建設業者は、令和6年11月5日(火)、午前9時35分頃、同月2日の降雨から1日以上経過しているため地盤が固くなっていると思い込み、地盤の強度を確認せず、誘導員による誘導の前に、2の配置された杭打機を2のとおり同月1日に地盤改良した直上を進行しようと移動した直後に、埋め戻しに使用した残土(地盤改良材(セメント、粘土鉱物及び水)を配合したもの。元請負人である株式会社大林組は降雨により乱され地盤表面の雨水の流れによって一部が流されたと推察している。)が水分を吸収していて(転倒当日のキャタピラ周辺には水たまりと押し出された残土が見られた。)、実際には当該地盤の耐力が約8t/㎡であっため、埋め戻し残土に接する地山が登坂してきた杭打機の重量に耐え切れず埋め戻し残土側に崩壊し、当該崩壊地点を転倒支点として、杭打機が前方に転倒し、市道を塞ぎ、市道の向かいの美術館の屋根を損傷し、電線を巻き込んで電柱も転倒させて一時周辺に停電(約20件3時間)を発生させ、通行人が転倒するなどの被害を生じさせた。 4 以上のとおり、当該建設業者は、建設業者として大型杭打機の転倒による危険を防止するために、大雨等が降った後や山留工事を施工した後等、地盤の状況の変化後に工事を再開して重機を移動させる際には、地盤の強度等を確認すべきところ、これを怠るなど、令和6年11月5日、3のとおり、建設工事を適切に施工しなかったために公衆に危害を及ぼした。 |
| Official source | https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=kensetugyousya&EID=search&no=1472 |
| Extraction / evidence timestamps | Extracted: 18 July 2026 at 19:15 / Evidence checked: 18 July 2026 at 19:15 / Archive captured: Not recorded |
4. Business Location and Permit Details
| Business location address | 大阪府堺市東区白鷺町一丁22番1号 |
|---|---|
| Representative | 三井 一平 |
| Permit / registration number | 大阪府知事(般-2)第20216号 |
| Permitted business types | Scaffolding, earthwork, and concrete works |
| Legal articles | 建設業法第28条第1項第1号 |
| Cause of action | 1 請負契約の状況 当該建設業者は、大阪市内の民間発注の工事において、株式会社大林組から一次下請負人としてヒロセ株式会社が事務所棟無芯ソイル工事、山留・構台・支保工工事等を請け負い、同社から当該建設業者がSMW工法工事、支持杭打設工事等を請け負った。 2 工事現場の状況 当該工事現場は、約2度の傾斜がある登坂に盛られた地面上に敷鉄板が置かれ、その上に当該建設業者の大型杭打機(6号機)(重量 28t/㎡)が配置されていた。当該建設業者は、注文者であるヒロセ株式会社にはこの勾配を水平にするよう依頼していたが、水平には改善されなかった。当該建設業者は、令和6年11月1日(金)に、当該杭打機で、地盤改良材を打設する工事を施工した。令和6年11月2日(土)、当該工事現場に、14時頃の1時間に約40mmの降雨があった。 なお、表層部の地盤改良は、ヒロセ株式会社等からの指示により、埋め戻し土に地盤改良材(セメント、粘土鉱物及び水)を配合する施工方法を採用しており、良質土等による置換は行われていなかった。 3 事故の状況 当該建設業者は、令和6年11月5日(火)、午前9時35分頃、同月2日の降雨から1日以上経過しているため地盤が固くなっていると思い込み、地盤の強度を確認せず、誘導員による誘導の前に、2の配置された杭打機を2のとおり同月1日に地盤改良した直上を進行しようと移動した直後に、埋め戻しに使用した残土(地盤改良材(セメント、粘土鉱物及び水)を配合したもの。元請負人である株式会社大林組は降雨により乱され地盤表面の雨水の流れによって一部が流されたと推察している。)が水分を吸収していて(転倒当日のキャタピラ周辺には水たまりと押し出された残土が見られた。)、実際には当該地盤の耐力が約8t/㎡であっため、埋め戻し残土に接する地山が登坂してきた杭打機の重量に耐え切れず埋め戻し残土側に崩壊し、当該崩壊地点を転倒支点として、杭打機が前方に転倒し、市道を塞ぎ、市道の向かいの美術館の屋根を損傷し、電線を巻き込んで電柱も転倒させて一時周辺に停電(約20件3時間)を発生させ、通行人が転倒するなどの被害を生じさせた。 4 以上のとおり、当該建設業者は、建設業者として大型杭打機の転倒による危険を防止するために、大雨等が降った後や山留工事を施工した後等、地盤の状況の変化後に工事を再開して重機を移動させる際には、地盤の強度等を確認すべきところ、これを怠るなど、令和6年11月5日、3のとおり、建設工事を適切に施工しなかったために公衆に危害を及ぼした。 |
| Overview page | https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=kensetugyousya&EID=search&no=1472 |
5. Other Confirmed Records for This Company
No other confirmed enforcement records linked to this company are shown within the current RegBase coverage.
Reviewer Notes
| Reviewer | Team / company | ||
|---|---|---|---|
| Review purpose | |||
| Additional notes | |||
- □ Official source URL or archived source was checked.
- □ Corporate Number, address, or other identifiers were reviewed to avoid confusing similarly named entities.
- □ This document is understood as a public-record evidence file, not a credit decision or legal opinion.
Current page: Enforcement record
This screen focuses on one disclosed action: governing law, authority, facts, source status, and review evidence. Open the company profile for company-level registry, Official Gazette, and related-company context.
Free report
Save a public-record evidence report for 株式会社葵組
Includes confirmed target-entity identifiers, regulator, governing law, source links, archive status, and reviewer note fields for internal due-diligence files.
For developers: JSON integration details
You do not need this for normal browsing. Use it only when integrating this enforcement record into an internal tool or AI workflow.
Action summary
- Company
- 株式会社葵組Japanese originalOriginal: 株式会社葵組Corporate Number: 4120101000008
- Entity match
- Confirmed entity match100/100Machine checkedsource_corporate_number_nta_current_name国税庁法人番号データとの独立照合で対象法人を確認しました(source_corporate_number_nta_current_name)。
- Governing law
- Construction Business Act建設業法
- Action type
- Directive指示
- Action date
- 26 February 2025
- Issuing authority
- Osaka Prefecture大阪府
- Industry context
- 建設業者
Violation
1. Contract Situation: The construction contractor was subcontracted by Hirose Corporation as a primary subcontractor for office building earthwork, shoring, formwork, and support work in Osaka City. The contractor then undertook SMW method work and support pile installation. 2. Site Conditions: The site was on a slope with approximately two inclines, covered with steel plates. A large pile driver (No. 6, weight 28 tons per square meter) was positioned on these plates. The contractor requested Hirose Corporation to level the slope, but it was not leveled. On November 1, 2024, the contractor performed ground improvement using a pile driver. On November 2, 2024, around 2:00 PM, approximately 40 mm of rain fell within one hour. Ground improvement involved mixing cement, clay minerals, and water into backfill soil as instructed by Hirose Corporation; no replacement with high-quality soil was performed. 3. Incident Details: On November 5, 2024, at around 9:35 AM, the contractor, believing the ground had hardened after more than a day since the rain, proceeded to move the pile driver without checking ground strength. Immediately after moving the equipment over the ground improved on November 1, residual soil (a mixture of cement, clay minerals, and water) used for backfill, which had absorbed moisture, caused the ground to collapse due to insufficient bearing capacity (~8 t/㎡). The collapse caused the pile driver to overturn forward, blocking a city road, damaging a museum roof across the street, entangling power lines, knocking over a utility pole, and causing a power outage affecting approximately 20 households for three hours. Pedestrians were also injured. 4. As a result, the contractor failed to properly assess and confirm ground conditions before relocating heavy machinery after weather events or construction activities, neglecting necessary safety precautions. This negligence led to the overturning of the pile driver and subsequent public hazards on November 5, 2024.
Show original Japanese text
1 請負契約の状況 当該建設業者は、大阪市内の民間発注の工事において、株式会社大林組から一次下請負人としてヒロセ株式会社が事務所棟無芯ソイル工事、山留・構台・支保工工事等を請け負い、同社から当該建設業者がSMW工法工事、支持杭打設工事等を請け負った。 2 工事現場の状況 当該工事現場は、約2度の傾斜がある登坂に盛られた地面上に敷鉄板が置かれ、その上に当該建設業者の大型杭打機(6号機)(重量 28t/㎡)が配置されていた。当該建設業者は、注文者であるヒロセ株式会社にはこの勾配を水平にするよう依頼していたが、水平には改善されなかった。当該建設業者は、令和6年11月1日(金)に、当該杭打機で、地盤改良材を打設する工事を施工した。令和6年11月2日(土)、当該工事現場に、14時頃の1時間に約40mmの降雨があった。 なお、表層部の地盤改良は、ヒロセ株式会社等からの指示により、埋め戻し土に地盤改良材(セメント、粘土鉱物及び水)を配合する施工方法を採用しており、良質土等による置換は行われていなかった。 3 事故の状況 当該建設業者は、令和6年11月5日(火)、午前9時35分頃、同月2日の降雨から1日以上経過しているため地盤が固くなっていると思い込み、地盤の強度を確認せず、誘導員による誘導の前に、2の配置された杭打機を2のとおり同月1日に地盤改良した直上を進行しようと移動した直後に、埋め戻しに使用した残土(地盤改良材(セメント、粘土鉱物及び水)を配合したもの。元請負人である株式会社大林組は降雨により乱され地盤表面の雨水の流れによって一部が流されたと推察している。)が水分を吸収していて(転倒当日のキャタピラ周辺には水たまりと押し出された残土が見られた。)、実際には当該地盤の耐力が約8t/㎡であっため、埋め戻し残土に接する地山が登坂してきた杭打機の重量に耐え切れず埋め戻し残土側に崩壊し、当該崩壊地点を転倒支点として、杭打機が前方に転倒し、市道を塞ぎ、市道の向かいの美術館の屋根を損傷し、電線を巻き込んで電柱も転倒させて一時周辺に停電(約20件3時間)を発生させ、通行人が転倒するなどの被害を生じさせた。 4 以上のとおり、当該建設業者は、建設業者として大型杭打機の転倒による危険を防止するために、大雨等が降った後や山留工事を施工した後等、地盤の状況の変化後に工事を再開して重機を移動させる際には、地盤の強度等を確認すべきところ、これを怠るなど、令和6年11月5日、3のとおり、建設工事を適切に施工しなかったために公衆に危害を及ぼした。
Business location and permit details
- Business location address
- 大阪府堺市東区白鷺町一丁22番1号
- Representative
- 三井 一平
- Permit / registration number
- 大阪府知事(般-2)第20216号
- Permitted business types
- Scaffolding, earthwork, and concrete works
- Legal articles
- 建設業法第28条第1項第1号
- Cause of action
- 1 請負契約の状況 当該建設業者は、大阪市内の民間発注の工事において、株式会社大林組から一次下請負人としてヒロセ株式会社が事務所棟無芯ソイル工事、山留・構台・支保工工事等を請け負い、同社から当該建設業者がSMW工法工事、支持杭打設工事等を請け負った。 2 工事現場の状況 当該工事現場は、約2度の傾斜がある登坂に盛られた地面上に敷鉄板が置かれ、その上に当該建設業者の大型杭打機(6号機)(重量 28t/㎡)が配置されていた。当該建設業者は、注文者であるヒロセ株式会社にはこの勾配を水平にするよう依頼していたが、水平には改善されなかった。当該建設業者は、令和6年11月1日(金)に、当該杭打機で、地盤改良材を打設する工事を施工した。令和6年11月2日(土)、当該工事現場に、14時頃の1時間に約40mmの降雨があった。 なお、表層部の地盤改良は、ヒロセ株式会社等からの指示により、埋め戻し土に地盤改良材(セメント、粘土鉱物及び水)を配合する施工方法を採用しており、良質土等による置換は行われていなかった。 3 事故の状況 当該建設業者は、令和6年11月5日(火)、午前9時35分頃、同月2日の降雨から1日以上経過しているため地盤が固くなっていると思い込み、地盤の強度を確認せず、誘導員による誘導の前に、2の配置された杭打機を2のとおり同月1日に地盤改良した直上を進行しようと移動した直後に、埋め戻しに使用した残土(地盤改良材(セメント、粘土鉱物及び水)を配合したもの。元請負人である株式会社大林組は降雨により乱され地盤表面の雨水の流れによって一部が流されたと推察している。)が水分を吸収していて(転倒当日のキャタピラ周辺には水たまりと押し出された残土が見られた。)、実際には当該地盤の耐力が約8t/㎡であっため、埋め戻し残土に接する地山が登坂してきた杭打機の重量に耐え切れず埋め戻し残土側に崩壊し、当該崩壊地点を転倒支点として、杭打機が前方に転倒し、市道を塞ぎ、市道の向かいの美術館の屋根を損傷し、電線を巻き込んで電柱も転倒させて一時周辺に停電(約20件3時間)を発生させ、通行人が転倒するなどの被害を生じさせた。 4 以上のとおり、当該建設業者は、建設業者として大型杭打機の転倒による危険を防止するために、大雨等が降った後や山留工事を施工した後等、地盤の状況の変化後に工事を再開して重機を移動させる際には、地盤の強度等を確認すべきところ、これを怠るなど、令和6年11月5日、3のとおり、建設工事を適切に施工しなかったために公衆に危害を及ぼした。
- Overview page
- https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=kensetugyousya&EID=search&no=1472
These fields are extracted from the original Japanese disclosure or linked overview pages when available.
Compliance context
MediumA regulator issued a directive requiring specified action.
Construction business law covering licensing, contractor obligations, and public-interest rules for construction work.
Verify the required action and whether the company has disclosed remediation or completion.
This context is an operational aid for review workflows, not a credit opinion or legal conclusion.
Evidence pack
- Extracted at
- 2026-07-18T10:15:15.25+00:00
- Evidence checked
- 2026-07-18T10:15:15.11+00:00
- Archive captured
- Not archived
Show audit JSON
{
"record": {
"id": "619ba3d8-f709-4ffe-9f4f-3cf8fe2cea33",
"url": "https://regbase.jp/en/enforcement/kensetsu-gyoho-kui-zu-20250226",
"company_name_original": "株式会社葵組",
"company_name_registry": "株式会社葵組",
"corporate_number": "4120101000008",
"law": {
"ja": "建設業法",
"en": "Construction Business Act"
},
"action_type": {
"ja": "指示",
"en": "Directive"
},
"authority": {
"ja": "大阪府",
"en": "Osaka Prefecture"
}
},
"entity_match": {
"status": "confirmed",
"confidence": 100,
"method": "source_corporate_number_nta_current_name",
"method_label": "source_corporate_number_nta_current_name",
"notes": "国税庁法人番号データとの独立照合で対象法人を確認しました(source_corporate_number_nta_current_name)。"
},
"review": {
"status": "machine_reviewed",
"label": "Machine checked"
},
"compliance_context": {
"severity": "Medium",
"actionMeaning": "A regulator issued a directive requiring specified action.",
"practicalNote": "Verify the required action and whether the company has disclosed remediation or completion.",
"lawContext": "Construction business law covering licensing, contractor obligations, and public-interest rules for construction work."
},
"evidence": {
"recordUrl": "https://regbase.jp/en/enforcement/kensetsu-gyoho-kui-zu-20250226",
"officialSourceUrl": "https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=kensetugyousya&EID=search&no=1472",
"officialDocumentUrl": null,
"archiveUrl": null,
"archivedSourceUrl": null,
"archiveCapturedAt": null,
"extractedAt": "2026-07-18T10:15:15.25+00:00",
"translatedAt": "2026-05-01T07:51:25.434+00:00",
"evidenceCheckedAt": "2026-07-18T10:15:15.11+00:00",
"generatedAt": "2026-07-24T14:03:02.826Z"
},
"limitations": [
"RegBase aggregates public Japanese government disclosures and does not provide a credit opinion.",
"English summaries are provided for reference. The original Japanese source is authoritative.",
"Possible or unresolved entity matches should be manually verified before use in a decision."
]
}The original Japanese disclosure is the authoritative record. Use possible or unresolved matches only as leads for manual review.
Language
日本語版を見る (Japanese)Company info
- English name
- 株式会社葵組 Japanese original
- Japanese name
- 株式会社葵組
- Corporate Number
- 4120101000008
- Registered address
- 大阪府堺市東区白鷺町1丁22番1号