Company profile

Company profileConfirmed enforcement recordsJapanese original

土佐くろしお鉄道株式会社

土佐くろしお鉄道株式会社· Corporate Number: 9490001001543

This page aggregates company identity, Official Gazette notices, enforcement records, related-company signals, and source-review links into one public-record profile.

Current page: Company profile

This page brings together Official Gazette notices, enforcement records, registry data, related-company signals, and source-review links for one company. Open individual enforcement records from the history section below.

Public Record Summary

Enforcement records
2
Latest public record
22 Dec 2023

Compared with 184 peer companies with enforcement records in the 鉄道事業者 industry

This company: 2/peer average: 2.4 (median 2)→ around peer average

Repeated actions: 2 actions are recorded for this company. Multiple actions under the same law may be relevant when reviewing repeat compliance issues.

Company Identity and Registry Data

English display name
土佐くろしお鉄道株式会社
Original Japanese name
土佐くろしお鉄道株式会社
Corporate Number
9490001001543
Registered address
高知県高知市丸ノ内1丁目2番20号
Industry
鉄道事業者

Note: Detailed gBizINFO registry data may not be available for this company yet. Use the public registry links below to review supplemental source information.

Save a record of your review

Keep the records and their sources together

Review what is included, then save the report and CSV in an evidence ZIP for internal sharing. Available source files vary by target.

This company: ¥2,980 including tax, one-time purchase. No charge for reviewing the contents. Available files are listed before checkout.

2 records on this page; confirm the delivery scope on the next page.

Four or more packs in a month? Compare Business ・ Already purchased? Sign in

Enforcement and administrative action history

Railway Business ActAdministrative Guidance
Multiple confirmed recordsConfirmed entity match

Between October 3 and 6, 2023, a safety audit was conducted on Tosa Kuroshio Railway Co., Ltd. The audit revealed multiple issues requiring improvement. Specifically, driver-related personnel did not perform temporary driver suitability inspections (attention distribution tests) as mandated by Article 10 of the operational standards management regulations. Additionally, electrical staff did not receive new employee training as specified in the training regulations, and the annual training plans and results were not reported to the General Affairs Manager as required. The company must promptly conduct the overdue inspections and training, and review its training and management systems to ensure proper implementation. Furthermore, the periodic inspection of automatic train stop devices, as stipulated in Article 79 of the safety equipment implementation standards, was not performed despite the Q-values falling below standard. Repairs must be promptly carried out, and maintenance management systems should be improved. Inspections of crossing alarms at Nakakado crossing, including measurement of control section length, were not conducted. These must be performed immediately, and inspection systems should be enhanced to ensure regular and thorough inspections. Lastly, the voltage measurement results of signal lamps at Kubokawa Station were not recorded during routine inspections as required. Records must be maintained accurately, and inspection management systems should be improved. The company is instructed to investigate the root causes of these deficiencies, implement corrective actions, and report the measures taken by January 29, 2024.

22 Dec 2023
Official source URL recordedKiroku archive completeReview details and sources on RegBase
Railway Business ActAdministrative Guidance
Multiple confirmed recordsConfirmed entity match

The incident involved a train derailment on June 2, 2023, between Tosa-Shirahama Station and Arai River Station on the Nakamura Line, caused by landslides from slopes due to rainfall. Despite prior guidance issued on June 1, 2023, to monitor rainfall and weather conditions and to enforce appropriate operational restrictions, the train was operated at normal speed near the landslide site, resulting in derailment. The site was within a designated regulation zone for slope collapse during rain, but the rain gauge alarm system was not properly monitored. Contributing factors included the train being the last service of the day, the staff being preoccupied with arrangements to cease operations, and the station master responsible for issuing operational restrictions being away from the rain gauge monitoring room. Fortunately, all passengers had disembarked before the incident, but it posed a risk of injury. The company has resumed operations with emergency measures such as slow speed near the site and has been warned to continue thorough safety measures, investigate underlying causes, review operational regulations and systems, and implement permanent slope countermeasures promptly. The company is also instructed to report the measures taken in writing. This guidance was issued by the Shikoku Transport Bureau.

9 Jun 2023
Official source URL recordedKiroku archive completeReview details and sources on RegBase

Breakdown by law

Breakdown by action type

About this English name

No official English name source is recorded. The original Japanese name is shown.

If this profile contains an error or your company needs to add context, please use the correction request form. Submissions are reviewed under RegBase editorial policy.

This page mechanically aggregates and structures public government disclosures and public registry data under the editorial policy. It is not legal advice, credit scoring, or a final procurement decision. Always verify against the official source pages.