Company profile

Company profileConfirmed enforcement recordsEnglish summaries 1/1Japanese original

北条鉄道株式会社

北条鉄道株式会社· Corporate Number: 5140001076459

北条鉄道株式会社 is a Japanese company registered in Hyogo Prefecture with Corporate Number 5140001076459. RegBase lists 1 public-source enforcement record for this company. The latest listed record is classified as Administrative Guidance on 25 Dec 2023. Users should verify material records against the original Japanese source before making legal, credit, procurement, or onboarding decisions.

Ask RegBase about this company

Current page: Company profile

This page brings together Official Gazette notices, enforcement records, registry data, related-company signals, and source-review links for one company. Open individual enforcement records from the history section below.

Public Record Summary

Enforcement records
1
Latest public record
25 Dec 2023

Compared with 183 peer companies with enforcement records in the 鉄道事業者 industry

This company: 1/peer average: 2 (median 2)→ below peer average

Company Identity and Registry Data

English display name
北条鉄道株式会社
Original Japanese name
北条鉄道株式会社
Corporate Number
5140001076459
Registered address
兵庫県加西市北条町北条28番地の2
Industry
鉄道事業者

Note: Detailed gBizINFO registry data may not be available for this company yet. Use the public registry links below to review supplemental source information.

Direct inquiry

Need a person to review 北条鉄道株式会社?

No account needed

Ask a Japan-based team member to confirm the legal entity, explain the recorded public sources, or scope a documented screening.

Inquiry context: 北条鉄道株式会社 / Corporate Number 5140001076459

No phone number or account is required. We normally reply within two to three business days. Read our privacy policy.

English public-record screening

Need a documented check for 北条鉄道株式会社?

Get a structured English summary of the company identity and public records collected by RegBase, with source links, confirmation dates, and a clearly stated scope.

  • ✓ English and Japanese company identity
  • ✓ Enforcement and public-record summary
  • ✓ Official-source URLs and confirmation dates
  • ✓ PDF or CSV for an internal review file

This is not a credit report, safety guarantee, sanctions conclusion, legal opinion, or full due-diligence investigation.

No account required. The report opens immediately after Stripe confirms payment.

See sample screeningView pricingAsk a Japan-based researcher

Public documents and saved materials

View the original publications, see what was preserved, or download each file below.

Loading materials…

Need help interpreting these materials or confirming which legal entity they belong to? Ask RegBase about this company.

Enforcement and administrative action history

Railway Business ActAdministrative Guidance
Confirmed entity match

Between August 28 and 29, 2023, the Kinki Regional Development Bureau conducted a safety audit of Hojo Railway Co., Ltd. Based on the audit results, the bureau identified issues requiring improvement and issued directives for corrective actions. The company must investigate the root causes, including underlying factors, and implement measures to prevent recurrence. A report on the corrective measures is required by January 25, 2024. The audit findings include: 1. Lack of defined training procedures for personnel contracted for maintenance work, and inadequate management of education and training under Article 11 of the Implementation Standards Management Regulations. The company must establish training procedures and ensure personnel possess necessary knowledge and skills. 2. Non-compliance with track clearance and alignment standards, as inspections in March 2023 did not include proper clearance assessments or necessary adjustments. The company must review recent inspection results, promptly conduct clearance assessments, and carry out necessary adjustments. 3. Failure to perform regular inspections of track displacement at vehicle parking areas and platform gaps and heights at all stations, including Hojo-cho Station. The inspection cycle and methods are not specified in the relevant standards. The company must define inspection cycles and methods, conduct the inspections, and address any issues that hinder safe operations, including revising management systems. 4. Inadequate periodic inspections of crossing safety equipment and interlocking devices at Hojo-cho Station, including button operation status, display conditions, installation, damage, and wiring. The company must promptly address these deficiencies to ensure proper electrical equipment management. The company is required to report on the implementation of these corrective measures by January 25, 2024.

25 Dec 2023
Official source URL recordedKiroku archive completeReview details and sources on RegBase

Breakdown by law

Breakdown by action type

About this English name

No official English name source is recorded. The original Japanese name is shown.

If this profile contains an error or your company needs to add context, please use the data correction request form. Submissions are reviewed under RegBase editorial policy.

This page mechanically aggregates and structures public government disclosures and public registry data under the methodology. It is not legal advice, credit scoring, or a final procurement decision. Always verify against the official source pages.