Enforcement record
Directive against 中㐂建設株式会社
This page is one enforcement record linked to a confirmed legal entity. Company-level Official Gazette notices, registry data, related-company signals, and other public records are collected on the company profile.
View company profileAction type
Directive
Law
Construction Business Act
Authority
Osaka Prefecture
Action date
29 November 2024
RegBase evidence report
Japanese public-record enforcement check
Saveable record of the confirmed target entity, regulator disclosure, source status, and review notes for internal compliance files.
- Report ID
- RB-EN-ENFORCEMENT-KENSETSU-GYOHO-ZH-202607241405
- Generated at
- 24 July 2026 at 23:05
- Record URL
- https://regbase.jp/en/enforcement/kensetsu-gyoho-zhong-jian-she-20241129
1. Review Summary
| Target entity | 中㐂建設株式会社 | Corporate Number | 8120101039991 |
|---|---|---|---|
| Enforcement record | 1 record | Other confirmed records for this company | 0 records |
| Action date | 29 November 2024 | Authority | Osaka Prefecture |
| Law | Construction Business Act | Action type | Directive |
| Source status | Preserved public-source archive recorded | ||
This report summarizes public Japanese government disclosure data held by RegBase. It is not a credit score, sanctions conclusion, legal opinion, or adverse-media determination. Confirm important decisions against the linked official Japanese source.
2. Target Entity
| English display name | 中㐂建設株式会社 |
|---|---|
| Original Japanese name | 中㐂建設株式会社 |
| English-name source | Japanese original |
| Corporate Number | 8120101039991 |
| Company status | Active |
| Representative | 中庄谷 喜代一 |
| Registered address | 大阪府泉佐野市松原1丁目2番8号 |
| Industry / capital | Industry: 建設業 / Capital: - |
3. Enforcement Record
| Target name in disclosure | 中㐂建設株式会社 |
|---|---|
| Authority | Osaka Prefecture (大阪府) |
| Law / action type | Construction Business Act / Directive |
| Action / announcement date | Action: 29 November 2024 / Announcement: 25 April 2026 |
| English summary | 1. The construction business operator, in a private construction project within Sennan City, delivered a new residential building around December 2022, but failed to deposit the housing defect liability guarantee funds or conclude the housing defect liability insurance contract as required by the Act on Securing Performance of Housing Defects Liability Insurance (履行確保法) within three weeks from the standard date specified in Article 3, Paragraph 1, after delivery, violating the law. 2. (1) The operator, concerning a new residential building in Kishiwada City, concluded a housing defect liability insurance contract in October 2017, but failed to report the status of the contract within three weeks from each standard date, violating Article 4, Paragraph 1 of the Act. (2) Despite delivering new residential buildings to the client in the current project, the operator again failed to report the status of deposit and insurance contract conclusion within three weeks from each standard date, violating the same law. 3. Due to not reporting as required under Article 4, Paragraph 1, the operator was prohibited from entering into new residential construction contracts after 50 days from the day following each standard date. Nevertheless, in October 2022, the operator entered into a new construction contract with the client, violating Article 5 of the Act on Securing Performance of Housing Defects Liability Insurance, which is a violation of the Building Business Act, Article 28, Paragraph 1, Item 9. |
| Original Japanese text | 1 当該建設業者は、発注者から請け負った泉佐野市内の民間発注の工事(以下「本件工事」という。)において、令和4年12月頃に発注者に特定住宅瑕疵担保責任の履行の確保等に関する法律(平成19年法律第66号。以下「履行確保法」という。)第3条第1項の新築住宅(以下単に「新築住宅」という。)を引き渡した後、同項の規定に違反して、同項の基準日から3週間を経過する日(令和5年4月21日(金))までの間において、同項の規定による住宅建設瑕疵担保保証金の供託又は同条第2項に規定する住宅建設瑕疵担保責任保険契約(以下単に「住宅建設瑕疵担保責任保険契約」という。)の締結をしていなかった。 2 (1) 当該建設業者は、発注者から請け負って引き渡した岸和田市内の新築住宅を対象として、平成29年10月に住宅建設瑕疵担保責任保険契約の締結をしたものの、履行確保法第4条第1項の規定に違反して、同項の基準日ごとに、その基準日から3週間以内に、当該契約締結の状況について、同項の規定による届出をしなかった。 (2) 当該建設業者は、本件工事において新築住宅を発注者に引き渡したにもかかわらず、履行確保法第4条第1項の規定に違反して、同項の基準日ごとに、その基準日から3週間以内に、当該基準日に係る同法第3条第1項の規定による住宅建設瑕疵担保保証金の供託及び住宅建設瑕疵担保責任保険契約の締結の状況について、同法第4条第1項の規定による届出をしなかった。 3 当該建設業者は、2(1)のとおり、履行確保法第4条第1項の規定による届出を同項の基準日ごとにしていなかったため、当該基準日の翌日から起算して50日を経過した日以後においては、新たに住宅を新築する建設工事の請負契約を締結してはならないにもかかわらず、同法第5条の規定に違反して、令和4年10月に、発注者と本件工事の請負契約を締結した。(建設業法第28条第1項第9号該当) |
| Official source | https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=kensetugyousya&EID=search&no=1358 |
| Source archive | https://kiroku.today/a/abfd751e6bi5rrpg |
| Extraction / evidence timestamps | Extracted: 17 July 2026 at 17:40 / Evidence checked: 17 July 2026 at 17:40 / Archive captured: 13 July 2026 at 04:01 |
4. Business Location and Permit Details
| Business location address | 大阪府泉佐野市松原1-2-8 |
|---|---|
| Representative | 中庄谷 喜代一 |
| Permit / registration number | 大阪府知事(特-3)第5204号 |
| Permitted business types | Civil engineering works, Building works, Carpentry works, Plastering works, Scaffolding, earthwork, and concrete works, Stone works, Roof works, Tile, brick, and block works, Steel structure works, Reinforcing bar works, Paving works, し, Sheet-metal works, Glass works, Painting works, Waterproofing works, Interior finishing works, Thermal insulation works, Fittings works, Water facilities works, Demolition works |
| Legal articles | 建設業法第28条第1項柱書及び同項第9号 |
| Cause of action | 1 当該建設業者は、発注者から請け負った泉佐野市内の民間発注の工事(以下「本件工事」という。)において、令和4年12月頃に発注者に特定住宅瑕疵担保責任の履行の確保等に関する法律(平成19年法律第66号。以下「履行確保法」という。)第3条第1項の新築住宅(以下単に「新築住宅」という。)を引き渡した後、同項の規定に違反して、同項の基準日から3週間を経過する日(令和5年4月21日(金))までの間において、同項の規定による住宅建設瑕疵担保保証金の供託又は同条第2項に規定する住宅建設瑕疵担保責任保険契約(以下単に「住宅建設瑕疵担保責任保険契約」という。)の締結をしていなかった。 2 (1) 当該建設業者は、発注者から請け負って引き渡した岸和田市内の新築住宅を対象として、平成29年10月に住宅建設瑕疵担保責任保険契約の締結をしたものの、履行確保法第4条第1項の規定に違反して、同項の基準日ごとに、その基準日から3週間以内に、当該契約締結の状況について、同項の規定による届出をしなかった。 (2) 当該建設業者は、本件工事において新築住宅を発注者に引き渡したにもかかわらず、履行確保法第4条第1項の規定に違反して、同項の基準日ごとに、その基準日から3週間以内に、当該基準日に係る同法第3条第1項の規定による住宅建設瑕疵担保保証金の供託及び住宅建設瑕疵担保責任保険契約の締結の状況について、同法第4条第1項の規定による届出をしなかった。 3 当該建設業者は、2(1)のとおり、履行確保法第4条第1項の規定による届出を同項の基準日ごとにしていなかったため、当該基準日の翌日から起算して50日を経過した日以後においては、新たに住宅を新築する建設工事の請負契約を締結してはならないにもかかわらず、同法第5条の規定に違反して、令和4年10月に、発注者と本件工事の請負契約を締結した。(建設業法第28条第1項第9号該当) |
| Overview page | https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=kensetugyousya&EID=search&no=1358 |
5. Other Confirmed Records for This Company
No other confirmed enforcement records linked to this company are shown within the current RegBase coverage.
Reviewer Notes
| Reviewer | Team / company | ||
|---|---|---|---|
| Review purpose | |||
| Additional notes | |||
- □ Official source URL or archived source was checked.
- □ Corporate Number, address, or other identifiers were reviewed to avoid confusing similarly named entities.
- □ This document is understood as a public-record evidence file, not a credit decision or legal opinion.
Current page: Enforcement record
This screen focuses on one disclosed action: governing law, authority, facts, source status, and review evidence. Open the company profile for company-level registry, Official Gazette, and related-company context.
Free report
Save a public-record evidence report for 中㐂建設株式会社
Includes confirmed target-entity identifiers, regulator, governing law, source links, archive status, and reviewer note fields for internal due-diligence files.
Preserved evidence by Kiroku
Review the preserved source for 中㐂建設株式会社
Open the preserved public source with its capture time, original artifact, available verification data, and downloadable evidence pack.
For developers: JSON integration details
You do not need this for normal browsing. Use it only when integrating this enforcement record into an internal tool or AI workflow.
Action summary
- Company
- 中㐂建設株式会社Japanese originalOriginal: 中㐂建設株式会社Corporate Number: 8120101039991
- Entity match
- Confirmed entity match100/100Machine checkedsource_corporate_number_nta_current_name国税庁法人番号データとの独立照合で対象法人を確認しました(source_corporate_number_nta_current_name)。
- Governing law
- Construction Business Act建設業法
- Action type
- Directive指示
- Action date
- 29 November 2024
- Issuing authority
- Osaka Prefecture大阪府
- Industry context
- 建設業者
Violation
1. The construction business operator, in a private construction project within Sennan City, delivered a new residential building around December 2022, but failed to deposit the housing defect liability guarantee funds or conclude the housing defect liability insurance contract as required by the Act on Securing Performance of Housing Defects Liability Insurance (履行確保法) within three weeks from the standard date specified in Article 3, Paragraph 1, after delivery, violating the law. 2. (1) The operator, concerning a new residential building in Kishiwada City, concluded a housing defect liability insurance contract in October 2017, but failed to report the status of the contract within three weeks from each standard date, violating Article 4, Paragraph 1 of the Act. (2) Despite delivering new residential buildings to the client in the current project, the operator again failed to report the status of deposit and insurance contract conclusion within three weeks from each standard date, violating the same law. 3. Due to not reporting as required under Article 4, Paragraph 1, the operator was prohibited from entering into new residential construction contracts after 50 days from the day following each standard date. Nevertheless, in October 2022, the operator entered into a new construction contract with the client, violating Article 5 of the Act on Securing Performance of Housing Defects Liability Insurance, which is a violation of the Building Business Act, Article 28, Paragraph 1, Item 9.
Show original Japanese text
1 当該建設業者は、発注者から請け負った泉佐野市内の民間発注の工事(以下「本件工事」という。)において、令和4年12月頃に発注者に特定住宅瑕疵担保責任の履行の確保等に関する法律(平成19年法律第66号。以下「履行確保法」という。)第3条第1項の新築住宅(以下単に「新築住宅」という。)を引き渡した後、同項の規定に違反して、同項の基準日から3週間を経過する日(令和5年4月21日(金))までの間において、同項の規定による住宅建設瑕疵担保保証金の供託又は同条第2項に規定する住宅建設瑕疵担保責任保険契約(以下単に「住宅建設瑕疵担保責任保険契約」という。)の締結をしていなかった。 2 (1) 当該建設業者は、発注者から請け負って引き渡した岸和田市内の新築住宅を対象として、平成29年10月に住宅建設瑕疵担保責任保険契約の締結をしたものの、履行確保法第4条第1項の規定に違反して、同項の基準日ごとに、その基準日から3週間以内に、当該契約締結の状況について、同項の規定による届出をしなかった。 (2) 当該建設業者は、本件工事において新築住宅を発注者に引き渡したにもかかわらず、履行確保法第4条第1項の規定に違反して、同項の基準日ごとに、その基準日から3週間以内に、当該基準日に係る同法第3条第1項の規定による住宅建設瑕疵担保保証金の供託及び住宅建設瑕疵担保責任保険契約の締結の状況について、同法第4条第1項の規定による届出をしなかった。 3 当該建設業者は、2(1)のとおり、履行確保法第4条第1項の規定による届出を同項の基準日ごとにしていなかったため、当該基準日の翌日から起算して50日を経過した日以後においては、新たに住宅を新築する建設工事の請負契約を締結してはならないにもかかわらず、同法第5条の規定に違反して、令和4年10月に、発注者と本件工事の請負契約を締結した。(建設業法第28条第1項第9号該当)
Business location and permit details
- Business location address
- 大阪府泉佐野市松原1-2-8
- Representative
- 中庄谷 喜代一
- Permit / registration number
- 大阪府知事(特-3)第5204号
- Permitted business types
- Civil engineering works, Building works, Carpentry works, Plastering works, Scaffolding, earthwork, and concrete works, Stone works, Roof works, Tile, brick, and block works, Steel structure works, Reinforcing bar works, Paving works, し, Sheet-metal works, Glass works, Painting works, Waterproofing works, Interior finishing works, Thermal insulation works, Fittings works, Water facilities works, Demolition works
- Legal articles
- 建設業法第28条第1項柱書及び同項第9号
- Cause of action
- 1 当該建設業者は、発注者から請け負った泉佐野市内の民間発注の工事(以下「本件工事」という。)において、令和4年12月頃に発注者に特定住宅瑕疵担保責任の履行の確保等に関する法律(平成19年法律第66号。以下「履行確保法」という。)第3条第1項の新築住宅(以下単に「新築住宅」という。)を引き渡した後、同項の規定に違反して、同項の基準日から3週間を経過する日(令和5年4月21日(金))までの間において、同項の規定による住宅建設瑕疵担保保証金の供託又は同条第2項に規定する住宅建設瑕疵担保責任保険契約(以下単に「住宅建設瑕疵担保責任保険契約」という。)の締結をしていなかった。 2 (1) 当該建設業者は、発注者から請け負って引き渡した岸和田市内の新築住宅を対象として、平成29年10月に住宅建設瑕疵担保責任保険契約の締結をしたものの、履行確保法第4条第1項の規定に違反して、同項の基準日ごとに、その基準日から3週間以内に、当該契約締結の状況について、同項の規定による届出をしなかった。 (2) 当該建設業者は、本件工事において新築住宅を発注者に引き渡したにもかかわらず、履行確保法第4条第1項の規定に違反して、同項の基準日ごとに、その基準日から3週間以内に、当該基準日に係る同法第3条第1項の規定による住宅建設瑕疵担保保証金の供託及び住宅建設瑕疵担保責任保険契約の締結の状況について、同法第4条第1項の規定による届出をしなかった。 3 当該建設業者は、2(1)のとおり、履行確保法第4条第1項の規定による届出を同項の基準日ごとにしていなかったため、当該基準日の翌日から起算して50日を経過した日以後においては、新たに住宅を新築する建設工事の請負契約を締結してはならないにもかかわらず、同法第5条の規定に違反して、令和4年10月に、発注者と本件工事の請負契約を締結した。(建設業法第28条第1項第9号該当)
- Overview page
- https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=kensetugyousya&EID=search&no=1358
These fields are extracted from the original Japanese disclosure or linked overview pages when available.
Compliance context
MediumA regulator issued a directive requiring specified action.
Construction business law covering licensing, contractor obligations, and public-interest rules for construction work.
Verify the required action and whether the company has disclosed remediation or completion.
This context is an operational aid for review workflows, not a credit opinion or legal conclusion.
Evidence pack
- Extracted at
- 2026-07-17T08:40:15.057+00:00
- Evidence checked
- 2026-07-17T08:40:15+00:00
- Archive captured
- 2026-07-12T19:01:02.167214+00:00
Show audit JSON
{
"record": {
"id": "0a56c393-09e0-4b2e-b5ee-39ed7ff194b9",
"url": "https://regbase.jp/en/enforcement/kensetsu-gyoho-zhong-jian-she-20241129",
"company_name_original": "中㐂建設株式会社",
"company_name_registry": "中㐂建設株式会社",
"corporate_number": "8120101039991",
"law": {
"ja": "建設業法",
"en": "Construction Business Act"
},
"action_type": {
"ja": "指示",
"en": "Directive"
},
"authority": {
"ja": "大阪府",
"en": "Osaka Prefecture"
}
},
"entity_match": {
"status": "confirmed",
"confidence": 100,
"method": "source_corporate_number_nta_current_name",
"method_label": "source_corporate_number_nta_current_name",
"notes": "国税庁法人番号データとの独立照合で対象法人を確認しました(source_corporate_number_nta_current_name)。"
},
"review": {
"status": "machine_reviewed",
"label": "Machine checked"
},
"compliance_context": {
"severity": "Medium",
"actionMeaning": "A regulator issued a directive requiring specified action.",
"practicalNote": "Verify the required action and whether the company has disclosed remediation or completion.",
"lawContext": "Construction business law covering licensing, contractor obligations, and public-interest rules for construction work."
},
"evidence": {
"recordUrl": "https://regbase.jp/en/enforcement/kensetsu-gyoho-zhong-jian-she-20241129",
"officialSourceUrl": "https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=kensetugyousya&EID=search&no=1358",
"officialDocumentUrl": null,
"archiveUrl": "https://kiroku.today/a/abfd751e6bi5rrpg",
"archivedSourceUrl": "https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=kensetugyousya&EID=search&no=1358",
"archiveCapturedAt": "2026-07-12T19:01:02.167214+00:00",
"extractedAt": "2026-07-17T08:40:15.057+00:00",
"translatedAt": "2026-05-01T07:56:58.031+00:00",
"evidenceCheckedAt": "2026-07-17T08:40:15+00:00",
"generatedAt": "2026-07-24T14:05:28.307Z"
},
"limitations": [
"RegBase aggregates public Japanese government disclosures and does not provide a credit opinion.",
"English summaries are provided for reference. The original Japanese source is authoritative.",
"Possible or unresolved entity matches should be manually verified before use in a decision."
]
}The original Japanese disclosure is the authoritative record. Use possible or unresolved matches only as leads for manual review.
Language
日本語版を見る (Japanese)Company info
- English name
- 中㐂建設株式会社 Japanese original
- Japanese name
- 中㐂建設株式会社
- Corporate Number
- 8120101039991
- Registered address
- 大阪府泉佐野市松原1丁目2番8号
Recent records in the same industry
About this recordAggregated and translated from public Japanese government disclosures. The English text is for reference only — authoritative content is the linked Japanese source.