Enforcement and administrative action

Business Suspension disclosure naming 株式会社佐藤企業

株式会社佐藤企業

The published name has not been matched to a verified Corporate Number. Check the identity before attributing this record to a company.

Action type
Business Suspension
Law
Construction Business Act
Authority
Hokuriku Regional Development Bureau
Action date
27 May 2021

Published details

The former vice president and representative director of Sato Corporation, due to failing to win the bid for civil engineering and construction work, demanded on April 13, Reiwa 2 (2020), that a branch of a construction company accept the pile-driving work contract with Sato Corporation. Regarding the execution of this demand, he showed an attitude of exercising shareholder rights towards employees of the construction company and engaged in acts of intimidation to enforce the contract. As a result, he was sentenced to a fine through a summary order by the Tokyo Summary Court on July 13, Reiwa 2 (2020), and this sentence was finalized. This conduct is deemed to fall under Article 28, Paragraph 1, Item 3 of the Construction Business Act.

Machine-translated from the Japanese disclosure. The original Japanese text is available below.

Sources and saved materials

Review the source list, printable report and available saved files.

Evidence pack ¥4,980tax included · one-time purchase

View contents and purchase options

Available PDFs, images and other files vary by record. Check the included materials before purchasing; a source URL does not guarantee an original file is included.

Purchase and download pages are currently in Japanese. Materials retain the original source language.

Official source URL recorded · Queued for preservation

Source links and saved files require purchase. Already purchased?

Action details

Industry (as published)
建設業者
Business location address
新潟県新潟市中央区東堀前通一番町345番地
Representative
佐藤 謙一
Permit / registration number
国土交通大臣(特-29)第13375号
Permitted business types
Civil engineering works, Building works, Carpentry works, Plastering works, Scaffolding, earthwork, and concrete works, Stone works, Roof works, Tile, brick, and block works, Steel structure works, Reinforcing bar works, Paving works, しゆ, Sheet-metal works, Glass works, Painting works, Waterproofing works, Interior finishing works, Thermal insulation works, Fittings works, Water facilities works, Demolition works
Legal articles
建設業法第28条第1項(第3号該当)
Additional published details

The former vice president and representative director of Sato Corporation was ordered to pay a fine by the Tokyo Summary Court on July 13, Reiwa 2 (2020) for violating the Companies Act by coercing employees of a construction company to accept a pile-driving construction contract with Sato Corporation on April 13, Reiwa 2 (2020), after failing to win the bid for civil engineering and construction work, and demonstrating an attitude of exercising shareholder rights to influence the execution of the contract. This is recognized as applicable under Article 28, Paragraph 1, Item 3 of the Construction Business Act.

Show original Japanese text

株式会社佐藤企業の元代表取締役副社長が、土木建築工事の杭打ち工事を落札できなかったことを理由に、令和2年4月13日に建設会社の支店において前記杭打ち工事を株式会社佐藤企業に受注させることを要求し、その実行について、上記建設会社の従業員らに対し株主権を行使する態度を示し、その実行について、威迫の行為を行ったとして、株式会社佐藤企業の元代表取締役副社長が、会社法違反により令和2年7月13日に東京簡易裁判所から罰金刑の略式命令を受け、この刑が確定している。 このことが、建設業法第28条第1項第3号に該当すると認められる。

Sources, saved materials and verification

Source verification

Public-source and preservation status

Publishing authority
Hokuriku Regional Development Bureau
Official source URL
Recorded by RegBase
Entity match
Not confirmed; shown under the published name
Kiroku preservation
Queued for preservation

“Confirmed” means that RegBase matched this record to the cited public disclosure or entity under the stated checks. It does not verify the truth of the disclosure or guarantee the entity’s current status, creditworthiness, or any legal conclusion.

Open Sources and saved materials on this page to review the available pack contents.

About this action and law

This is a public Japanese regulatory disclosure. The exact legal effect depends on the cited source and regulator.

Construction business law covering licensing, contractor obligations, and public-interest rules for construction work.

Review the original Japanese source and determine relevance to your counterparty-risk workflow.

English translations are for reference. Verify important decisions against the original Japanese disclosure. View the Japanese page.