1. 12 Mar 2025 Administrative Guidance
| Authority | |
|---|---|
| Law / type | Railway Business Act / Administrative Guidance |
| Summary | On January 22-23, 2025, a safety audit was conducted on Towa Kanko Corporation. The audit revealed that certain inspection items for the electrical equipment of cable car facilities, specifically insulation resistance and grounding resistance measurements as specified in the Temporary Inspection (2) under Article 5 of the Ordinance for the Technical Standards of Ropeway Facilities, were not performed. The Chubu Transportation Bureau instructed the company to promptly conduct the necessary inspections and to improve the maintenance and management system of the cableway facilities to ensure proper inspections in accordance with the relevant regulations. The company is required to report the corrective measures taken by April 14, 2025. |
| Source | https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=tetudou&EID=search&no=178 |