Enforcement record
Administrative Guidance against 和歌山電鐵株式会社
This page is one enforcement record linked to a confirmed legal entity. Company-level Official Gazette notices, registry data, related-company signals, and other public records are collected on the company profile.
View company profileAction type
Administrative Guidance
Law
Railway Business Act
Authority
Action date
15 December 2023
RegBase evidence report
Japanese public-record enforcement check
Saveable record of the confirmed target entity, regulator disclosure, source status, and review notes for internal compliance files.
- Report ID
- RB-EN-ENFORCEMENT-BE1DA0CC-A1FE-4D1-202607241251
- Generated at
- 24 July 2026 at 21:51
- Record URL
- https://regbase.jp/en/enforcement/be1da0cc-a1fe-4d11-938c-8be3eb79cf07
1. Review Summary
| Target entity | 和歌山電鐵株式会社 | Corporate Number | 9170001005163 |
|---|---|---|---|
| Enforcement record | 1 record | Other confirmed records for this company | 0 records |
| Action date | 15 December 2023 | Authority | |
| Law | Railway Business Act | Action type | Administrative Guidance |
| Source status | Preserved public-source archive recorded | ||
This report summarizes public Japanese government disclosure data held by RegBase. It is not a credit score, sanctions conclusion, legal opinion, or adverse-media determination. Confirm important decisions against the linked official Japanese source.
2. Target Entity
| English display name | 和歌山電鐵株式会社 |
|---|---|
| Original Japanese name | 和歌山電鐵株式会社 |
| English-name source | Japanese original |
| Corporate Number | 9170001005163 |
| Company status | Active |
| Representative | Not recorded |
| Registered address | 和歌山県和歌山市伊太祈曽73番地 |
| Industry / capital | Industry: 鉄道事業者 / Capital: - |
3. Enforcement Record
| Target name in disclosure | 和歌山電鐵株式会社 |
|---|---|
| Authority | () |
| Law / action type | Railway Business Act / Administrative Guidance |
| Action / announcement date | Action: 15 December 2023 / Announcement: 10 July 2026 |
| English summary | From August 21 to September 1, 2023, the Wakayama Electric Railway Co., Ltd. underwent a safety audit, including on-site inspections from August 21 to 23 and August 30 to September 1. The audit revealed issues requiring improvement, leading to instructions for corrective actions. The company must investigate underlying causes, prevent recurrence, and report the measures taken by January 15, 2024. Specifically, the audit found that: 1. Some train drivers operated trains without meeting the visual acuity standards specified in the Ministerial Ordinance No. 8-2 related to locomotive driver licenses. The company is advised to review and strengthen its management system to ensure proper fitness verification. 2. Personnel operating train equipment alone, who did not meet the mental fitness criteria outlined in the relevant standards, were found to be performing tasks such as operating the switch. The company must verify the fitness of these personnel, ensure they understand tasks related to train operation, and provide appropriate instructions and supervision based on fitness assessments. 3. The platform height at Kichijoji Station partially obstructs the building clearance limits. The company is instructed to promptly take necessary measures to address this issue and develop repair plans considering inspection results. 4. Records of re-measurements and repairs related to track displacement inspections, as required by the standards, were not maintained. The company must ensure proper documentation and storage of these records. The guidance emphasizes the importance of root cause analysis, preventive measures, and timely reporting to the Kinki Transport Bureau. |
| Original Japanese text | 令和5年8月21日から9月1日まで、貴社に対して保安監査を実施(うち8月21日から8月23日及び8月30日から9月1日までは現地調査を実施)したところであるが、監査の結果、改善を要する事項が認められたことから、下記の事項について、改善措置を講ずるよう指示する。 また、改善措置を講ずるにあたっては、発生した背後要因を含めて原因を究明した上で、再発防止のための措置を講ずること。 なお、講じた措置については、令和6年1月15日までに報告されたい。 記 1.運転取扱実施基準第7条に規定する適性検査(身体機能検査)のうち視機能(視力)について、動力車操縦者運転免許に関する省令第8条の2(別表2)に規定する合格基準に適合していない運転士が列車を操縦していたことを確認した。 よって、運転士に対する適性検査(身体機能検査)について、確実な適性の有無の確認が行えるよう管理体制の見直しを行うこと。 2.車両関係実施基準第7条に規定する適性検査(精神機能検査)の結果が運転関係従事員の適性検査実施要綱3.適性検査の判断基準を満たしていない車両係員に対し、単独で転てつ器を操作する作業を行わせていたことを確認した。 よって、当該車両係員が作業を行うのに必要な適性の有無の確認を行うとともに、当該係員に対して列車又は車両の運転に直接関係する作業について理解させること。また、適性検査(精神機能検査)の結果を踏まえ、係員に適切に指示を行い、作業の実態について把握し適切に管理監督を行うこと。 3.土木関係実施基準第19条に規定する建築限界について、吉礼駅のプラットホームの高さが建築限界を一部支障していることを確認した。 よって、建築限界を支障している箇所について、速やかに必要な措置を講ずること。また、定期検査等の結果から実施基準に抵触する箇所等があった際には、修繕の時期及びその方法を検討した上で修繕計画を策定し、確実に整備を行うこと。 4.土木関係実施基準第83条に規定する軌道変位の定期検査について、再測定の結果及び修繕の結果の記録が保管されていないことを確認した。 よって、同実施基準第99条に基づき、定期検査の結果及び修繕の結果について、確実に記録し保管を行うこと。 【近畿運輸局】 |
| Official source | https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=tetudou&EID=search&no=103 |
| Source archive | https://kiroku.today/a/ad49a483fafzkwu9 |
| Extraction / evidence timestamps | Extracted: 17 July 2026 at 18:23 / Evidence checked: 17 July 2026 at 18:23 / Archive captured: 11 July 2026 at 15:34 |
4. Business Location and Permit Details
| Business location address | 和歌山県和歌山市 |
|---|---|
| Legal articles | 鉄道に関する技術上の基準を定める省令 |
| Overview page | https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=tetudou&EID=search&no=103 |
5. Other Confirmed Records for This Company
No other confirmed enforcement records linked to this company are shown within the current RegBase coverage.
Reviewer Notes
| Reviewer | Team / company | ||
|---|---|---|---|
| Review purpose | |||
| Additional notes | |||
- □ Official source URL or archived source was checked.
- □ Corporate Number, address, or other identifiers were reviewed to avoid confusing similarly named entities.
- □ This document is understood as a public-record evidence file, not a credit decision or legal opinion.
Current page: Enforcement record
This screen focuses on one disclosed action: governing law, authority, facts, source status, and review evidence. Open the company profile for company-level registry, Official Gazette, and related-company context.
Free report
Save a public-record evidence report for 和歌山電鐵株式会社
Includes confirmed target-entity identifiers, regulator, governing law, source links, archive status, and reviewer note fields for internal due-diligence files.
Preserved evidence by Kiroku
Review the preserved source for 和歌山電鐵株式会社
Open the preserved public source with its capture time, original artifact, available verification data, and downloadable evidence pack.
For developers: JSON integration details
You do not need this for normal browsing. Use it only when integrating this enforcement record into an internal tool or AI workflow.
Action summary
- Company
- 和歌山電鐵株式会社Japanese originalOriginal: 和歌山電鐵株式会社Corporate Number: 9170001005163
- Entity match
- Confirmed entity match100/100Machine checkedsource_corporate_number_nta_current_name国税庁法人番号データとの独立照合で対象法人を確認しました(source_corporate_number_nta_current_name)。
- Governing law
- Railway Business Act鉄道事業法
- Action type
- Administrative Guidance行政指導
- Action date
- 15 December 2023
- Issuing authority
- Industry context
- 鉄道事業者
Violation
From August 21 to September 1, 2023, the Wakayama Electric Railway Co., Ltd. underwent a safety audit, including on-site inspections from August 21 to 23 and August 30 to September 1. The audit revealed issues requiring improvement, leading to instructions for corrective actions. The company must investigate underlying causes, prevent recurrence, and report the measures taken by January 15, 2024. Specifically, the audit found that: 1. Some train drivers operated trains without meeting the visual acuity standards specified in the Ministerial Ordinance No. 8-2 related to locomotive driver licenses. The company is advised to review and strengthen its management system to ensure proper fitness verification. 2. Personnel operating train equipment alone, who did not meet the mental fitness criteria outlined in the relevant standards, were found to be performing tasks such as operating the switch. The company must verify the fitness of these personnel, ensure they understand tasks related to train operation, and provide appropriate instructions and supervision based on fitness assessments. 3. The platform height at Kichijoji Station partially obstructs the building clearance limits. The company is instructed to promptly take necessary measures to address this issue and develop repair plans considering inspection results. 4. Records of re-measurements and repairs related to track displacement inspections, as required by the standards, were not maintained. The company must ensure proper documentation and storage of these records. The guidance emphasizes the importance of root cause analysis, preventive measures, and timely reporting to the Kinki Transport Bureau.
Show original Japanese text
令和5年8月21日から9月1日まで、貴社に対して保安監査を実施(うち8月21日から8月23日及び8月30日から9月1日までは現地調査を実施)したところであるが、監査の結果、改善を要する事項が認められたことから、下記の事項について、改善措置を講ずるよう指示する。 また、改善措置を講ずるにあたっては、発生した背後要因を含めて原因を究明した上で、再発防止のための措置を講ずること。 なお、講じた措置については、令和6年1月15日までに報告されたい。 記 1.運転取扱実施基準第7条に規定する適性検査(身体機能検査)のうち視機能(視力)について、動力車操縦者運転免許に関する省令第8条の2(別表2)に規定する合格基準に適合していない運転士が列車を操縦していたことを確認した。 よって、運転士に対する適性検査(身体機能検査)について、確実な適性の有無の確認が行えるよう管理体制の見直しを行うこと。 2.車両関係実施基準第7条に規定する適性検査(精神機能検査)の結果が運転関係従事員の適性検査実施要綱3.適性検査の判断基準を満たしていない車両係員に対し、単独で転てつ器を操作する作業を行わせていたことを確認した。 よって、当該車両係員が作業を行うのに必要な適性の有無の確認を行うとともに、当該係員に対して列車又は車両の運転に直接関係する作業について理解させること。また、適性検査(精神機能検査)の結果を踏まえ、係員に適切に指示を行い、作業の実態について把握し適切に管理監督を行うこと。 3.土木関係実施基準第19条に規定する建築限界について、吉礼駅のプラットホームの高さが建築限界を一部支障していることを確認した。 よって、建築限界を支障している箇所について、速やかに必要な措置を講ずること。また、定期検査等の結果から実施基準に抵触する箇所等があった際には、修繕の時期及びその方法を検討した上で修繕計画を策定し、確実に整備を行うこと。 4.土木関係実施基準第83条に規定する軌道変位の定期検査について、再測定の結果及び修繕の結果の記録が保管されていないことを確認した。 よって、同実施基準第99条に基づき、定期検査の結果及び修繕の結果について、確実に記録し保管を行うこと。 【近畿運輸局】
Business location and permit details
- Business location address
- 和歌山県和歌山市
- Legal articles
- 鉄道に関する技術上の基準を定める省令
- Overview page
- https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=tetudou&EID=search&no=103
These fields are extracted from the original Japanese disclosure or linked overview pages when available.
Compliance context
Low-mediumAdministrative guidance or supervision was publicly disclosed by the authority.
Japanese regulatory disclosure under Railway Business Act.
Use as a monitoring signal. Confirm details before treating it as a formal sanction.
This context is an operational aid for review workflows, not a credit opinion or legal conclusion.
Evidence pack
- Extracted at
- 2026-07-17T09:23:19.818+00:00
- Evidence checked
- 2026-07-17T09:23:19.752+00:00
- Archive captured
- 2026-07-11T06:34:38.316706+00:00
Show audit JSON
{
"record": {
"id": "be1da0cc-a1fe-4d11-938c-8be3eb79cf07",
"url": "https://regbase.jp/en/enforcement/be1da0cc-a1fe-4d11-938c-8be3eb79cf07",
"company_name_original": "和歌山電鐵株式会社",
"company_name_registry": "和歌山電鐵株式会社",
"corporate_number": "9170001005163",
"law": {
"ja": "鉄道事業法",
"en": "Railway Business Act"
},
"action_type": {
"ja": "行政指導",
"en": "Administrative Guidance"
},
"authority": {
"ja": "",
"en": ""
}
},
"entity_match": {
"status": "confirmed",
"confidence": 100,
"method": "source_corporate_number_nta_current_name",
"method_label": "source_corporate_number_nta_current_name",
"notes": "国税庁法人番号データとの独立照合で対象法人を確認しました(source_corporate_number_nta_current_name)。"
},
"review": {
"status": "machine_reviewed",
"label": "Machine checked"
},
"compliance_context": {
"severity": "Low-medium",
"actionMeaning": "Administrative guidance or supervision was publicly disclosed by the authority.",
"practicalNote": "Use as a monitoring signal. Confirm details before treating it as a formal sanction.",
"lawContext": "Japanese regulatory disclosure under Railway Business Act."
},
"evidence": {
"recordUrl": "https://regbase.jp/en/enforcement/be1da0cc-a1fe-4d11-938c-8be3eb79cf07",
"officialSourceUrl": "https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=tetudou&EID=search&no=103",
"officialDocumentUrl": null,
"archiveUrl": "https://kiroku.today/a/ad49a483fafzkwu9",
"archivedSourceUrl": "https://www.mlit.go.jp/nega-inf/cgi-bin/search.cgi?jigyoubunya=tetudou&EID=search&no=103",
"archiveCapturedAt": "2026-07-11T06:34:38.316706+00:00",
"extractedAt": "2026-07-17T09:23:19.818+00:00",
"translatedAt": "2026-07-10T13:10:58.772+00:00",
"evidenceCheckedAt": "2026-07-17T09:23:19.752+00:00",
"generatedAt": "2026-07-24T12:51:30.134Z"
},
"limitations": [
"RegBase aggregates public Japanese government disclosures and does not provide a credit opinion.",
"English summaries are provided for reference. The original Japanese source is authoritative.",
"Possible or unresolved entity matches should be manually verified before use in a decision."
]
}The original Japanese disclosure is the authoritative record. Use possible or unresolved matches only as leads for manual review.
Language
日本語版を見る (Japanese)Company info
- English name
- 和歌山電鐵株式会社 Japanese original
- Japanese name
- 和歌山電鐵株式会社
- Corporate Number
- 9170001005163
- Registered address
- 和歌山県和歌山市伊太祈曽73番地
Recent records in the same industry
- Administrative Guidance11 May 2026
諏訪市
Railway Business Act
- Administrative Guidance11 May 2026
福井鉄道株式会社
Railway Business Act
- Administrative Guidance28 Apr 2026
豊橋鉄道株式会社
Railway Business Act
- Administrative Guidance28 Apr 2026
小湊鉄道株式会社
Railway Business Act
- Administrative Guidance14 Apr 2026
沖縄都市モノレール株式会社
Railway Business Act
About this recordAggregated and translated from public Japanese government disclosures. The English text is for reference only — authoritative content is the linked Japanese source.